Skip to content
Sign in

Post

VMS Ventures Inc.

Treasurer4.2 rating from 23 members599 ptsRate

Snow Lake Article

Snow Lake is fast becoming the front and center of Manitoba's Mineral Industry and far beyond. This can only bode well for VMS Ventures and shareholders.

The Underground Press- Written by Marc Jackson
November 12/2009 Volumne 13, Issue 23

Good things come in pairs... and truly great things come in threes! The people of Snow Lake know this to be true and have witnessed the fruit of this old adage over the last several months. The community has rebounded, seemingly overnight, from an isolated and forlorn settlement adrift in uncertainty, to the revitalized hub of Manitoba's mineral industry. Although a golden and base metal promise has been dangling over the collective head of Snow Lake for a number of years, it appears once the wheels of industry finally began to move, fulfillment arrived swiftly.


The first pillar in Snow Lake's triad of renewal came with HudBay Minerals' October 8th announcement confirming an $85 million expenditure to fund Phase 1 of their Lalor Project, 16.2 km from Snow Lake. With this investment, the deposit will be accessed by a production ramp from HudBay's Chisel North mine. The ramp is expected to provide early production of Lalor's zinc orebody and an access point for further underground exploration of the property's gold zones. The release stated that the work was expected to begin immediately.


The second post in the trilogy materialized on October 20th when Alexis Minerals Corporation reached an amicable deal to acquire Garson Gold Corporation in a share swap deal valued at $33.2 million. The acquisition solidified Alexis Mineral's holdings nationally, by adding the New Britannia Mine in Snow Lake to their holdings in the Rouyn-Noranda and Val d'Or areas of Quebec. Alexis officials noted that a production decision on Snow Lake's #3 Zone will be made at the end of the 2nd quarter of 2010 and a further decision will be made on the New Brit' mine at the outset of the 4th quarter of 2010. Subsequently, production could be achieved on #3 Zone at the beginning of 2011 and in the main mine by mid 2011. The New Brit' Mine employed close to 250 people during its last existence. Estimates by some in the know say that could very well happen again.


Finally, the third and last support in the trinity arrived in the early hours of Wednesday, October 30th. HudBay made an announcement that many in Snow Lake had hoped and prayed for over the previous 10 months. It was for some, closing notice that lives placed in turmoil for not quite a year could begin to take back some semblance of the normality they previously held. Yes, HudBay advised that they will immediately begin the process of re-starting operations at their Chisel North mine and Stall Lake concentrator, both situated near Snow Lake. They expect that in doing so, full production will be achieved in the second quarter of 2010. They say that this resumption of operations is expected to provide approximately 30,000 tonnes of zinc concentrate feed to the company's Flin Flon zinc plant annually and that the capital costs for the re-start will approach $7 million. Operating costs are expected to be comparable to what they were prior to the suspension of operations in January 2009.


The company also announced that it has sold forward approximately 50% of the anticipated zinc production from the Chisel North mine at an average price of approximately US$1.01 per pound. This hedge is intended to ensure that Chisel North remains economic at lower zinc prices, while providing an unencumbered upside for the remaining 50% of the mine's zinc production.

For those in Snow Lake, 2009 has been a whirlwind year that has seen residents experience both ends of the mining spectrum. The expectation is that 2010 will bring stability for all, prosperity for many, and a positive culmination to a decade of unbridled hope. MJ Written by Marc Jackson.

Page 4 THE Underground PRESS November 12, 2009

See Chisel on page 4...

Join the conversation about VMS Ventures Inc.

Reply

Replies

  1. Rockcliff drills 9.02% Cu, 3.46 g/t Au over 4.74 m

    2009-11-10 09:51 ET - News Release

    Mr. Ken Lapierre reports

    ROCKCLIFF HITS HIGH GRADE COPPER-GOLD MINERALIZATION AT SNOW LAKE, 4.74M GRADING 9.02% COPPER, 3.46G/T GOLD, 1.62% ZINC AND 36.5G/T SILVER DRILL PROGRAM DOUBLES IN SIZE

    Rockcliff Resources Inc.'s drilling on the Rail zone has intersected high-grade copper-gold mineralization on its Snow Lake VMS project located in central Manitoba. Hole RL09-37 intersected 4.74 metres of massive sulphides grading 9.02 per cent copper, 3.46 grams per tonne gold, 1.62 per cent zinc and 36.5 grams per tonne silver, including 3.99 metres grading 10.63 per cent copper, 3.86 grams per tonne gold, 1.77 per cent zinc and 42.5 grams per tonne silver. The hole was drilled in an untested area 150 metres north of the historic Rail VMS deposit. Drilling has now increased the Rail zone mineralization (copper, gold, zinc and silver) to 685 metres of strike length and up to 380 metres deep. The Rail zone remains open in all directions and is hosted within juvenile arc rocks of the Snow Lake camp. All VMS mines within the camp are hosted in juvenile arc rocks of the Flin Flon greenstone belt.

    An additional 2,500 metres of drilling has been added to the program. The program will focus on defining the outer limits of the Rail zone and test other high-priority geophysical targets identified in previous surveys in the area.

    Highlights from previous holes (RL07-01 to RL08-32) completed by Rockcliff on the Rail zone at the Rail property can be viewed on the company's website. Highlights from the recent drill holes RL09-33 to RL09-38 are in the table, including the following:

    • 8.38 metres grading 2.65 per cent copper, 0.43 gram per tonne gold, 0.06 per cent zinc and 4.5 grams per tonne silver, including 5.94 metres grading 3.03 per cent copper, 0.28 gram per tonne gold, 0.06 per cent zinc and five grams per tonne silver (RL09-33);
    • 4.11 metres grading 2.29 per cent copper, 0.50 gram per tonne gold, 0.08 per cent zinc and 4.5 grams per tonne silver, including 2.23 metres grading 2.91 per cent copper, 0.35 gram per tonne gold, 0.05 per cent zinc and 5.3 grams per tonne silver (RL09-34);
    • 4.74 metres grading 9.02 per cent copper, 3.46 grams per tonne gold, 1.62 per cent zinc and 36.5 grams per tonne silver, including 3.99 metres grading 10.63 per cent copper, 3.86 grams per tonne gold, 1.77 per cent zinc and 42.5 grams per tonne silver (RL09-37);
    • 3.97 metres grading 2.65 per cent copper, 1.18 grams per tonne gold, 1.64 per cent zinc and 11.8 grams per tonne silver, including 1.83 metres grading 5.58 per cent copper, 2.54 grams per tonne gold, 3.28 per cent zinc and 24.4 grams per tonne silver (RL09-38).

    Ken Lapierre, president and chief executive officer of Rockcliff, commented: "We are extremely encouraged with the drill results and in locating a new copper-gold-rich phase within the mineralized system of the Rail zone. The size of the zone continues to expand and confirms our belief in the prolific nature of the region and outstanding potential of our Snow Lake VMS project. Our project, which totals in excess of 500 square kilometres, hosts five underexplored historic VMS deposits and literally hundreds of untested geophysical targets with VMS and gold potential. We will continue to systematically explore and advance our project and look forward to additional discoveries in this world-class greenstone belt."

    To date, a total of 1,970 metres in six surface drill holes (RL09-33 to RL09-38) have been completed in this program on the Rail property. The Rail zone intersected in holes 33, 34 and 35 was drilled south of the historic Rail deposit and has confirmed that the copper-rich R1 VMS zone (please see news release in Stockwatch dated Oct. 1, 2008) is not a separate zone but a continuation of the Rail zone. Drill holes 36, 37 and 38, drilled north of the Rail deposit, have confirmed that this area hosts Rail zone mineralization which is more copper-gold rich. The Rail zone has been drilled to a present strike length of 685 metres and to depths of up to 380 metres and remains open in all directions. The zone consists of stringers and massive sulphide lenses of pyrite, pyrrhotite, chalcopyrite (copper rich) and sphalerite (zinc rich) hosted within a favourable five-kilometre-long trend of prospective juvenile arc rocks.

    Drilling is expected to continue up to the Christmas break and then continue into the new year.

    Significant assay results from drill holes RL09-33 to RL09-38 are tabulated along with drill hole information. The lengths reported are drill intersected core lengths and do not represent true widths.

                      DRILLING RESULTS
    
    Borehole   From      To   Length Copper  Gold  Zinc   Silver
                 (m)     (m)      (m)     %   g/t     %      g/t
    
    RL09-33  410.38  418.76     8.38   2.65  0.43  0.06      4.5
    includes 411.91  417.85     5.94   3.03  0.28  0.06      5.0
    RL09-34  369.45  373.56     4.11   2.29  0.50  0.08      4.5
    includes 369.45  371.67     2.22   2.91  0.35  0.05      5.3
    RL09-35  284.61  287.38     2.77   0.66  0.08  0.45      2.9
    includes 286.86  287.38     0.52   2.48  0.26  0.07      9.0
    RL09-36  128.38  128.75     0.37   6.16  1.00  1.48     20.2
    RL09-37   85.48   90.22     4.74   9.02  3.46  1.62     36.5
    includes  86.23   90.22     3.99  10.63  3.86  1.77     42.5
    includes  89.00   90.22     1.22  11.97  5.28  1.89     47.3
    RL09-38   99.97  103.94     3.97   2.65  1.18  1.64     11.8
    includes 101.48  103.31     1.83   5.58  2.54  3.28     24.4
    
    Note: Previous hole RL08-16 was extended 152 metres and 
    intersected no significant values.
    

    We seek Safe Harbor.

    The share price popped nicely, and I think that VMS could do the same with some drill results that we have already seen from this company in the past that are comparable

    I am ready for that event as are most on this board

    AK