summit snippet from interview
just to make it easy here is the snippet from the interview of Raul
on summit ( ironically there is not even any real information on the website about it)
"Summit will likely be permitted in the spring, perhaps as early as April. Summit awaits a final OK from a biological report to be finished as soon as the snow melts. Victoria has not yet drilled at Summit. Previous exploration campaigns at Summit (about 150 holes) suggest that grades may be significant. The best intercept from the surface is 95 feet (10-105 ft down hole) @ 0.442 opt, within which is 40 ft @ 1.009 opt gold. We have also estimated the area of alteration to be at least 3,500 feet wide and perhaps with a length as long as 20,000 feet. This size of the gold system is huge compared to the current drill hole footprint.
So there is huge potential for additional drilling within the alteration zone as well as at depth"
VIT is sick( slang for "insanely great" for the dutch), many miners would be happy to have the potential of one of our sites mixed in with their properties. they could limp along for years making a living with that little hope.
VIT's sites gives me exploration ADD........we have SO much here.
Join the conversation about Victoria Gold Corp.
Reply