Skip to content
Sign in

Post

Victoria Gold Corp

The post this replies to is no longer available.

Prez3.5 rating from 45 members2.2K ptsRate

Re: Reality of next drill holes

Chad stated that if we start a 3rd drilling phase at Cove McCoy via an adit the cost of drilling each hole will be 1/10th the cost of drilling holes drilling in phase 2. With drilling costs down from where they have been earlier this year, the cost will more than likely be even less than 1/10th.

Join the conversation about Victoria Gold Corp.

Reply