Skip to content
Sign in

Post

Wildcat Exploration Ltd

VEEP3.2 rating from 38 members3.7K ptsRate

NEWS

WILDCAT EXPLORATION LTD.
PRESS RELEASE
Wildcat Channel Sampling Demonstrates Gold Continuity on Jeep Project, Bissett MB
Winnipeg, Manitoba; November 19, 2009
Wildcat Exploration Ltd. (WEL: TSX-V) is pleased to announce that channel sampling on the newly discovered
Showing #4 and further channel sampling on Showing #1 has confirmed the continuity of gold and silver mineralization
along strike. These showings occur in the vicinity of the historical Jeep Gold Mine that is located on Wildcat’s 100%
owned Jeep property 13 km east of Bissett, Manitoba in the Rice Lake greenstone belt.
Showing #4 consists of a quartz bearing shear zone, up to 1.3 m wide, hosted in gabbro and containing disseminated
arsenopyrite and pyrite as well as visible gold. Showing #4 is located approximately 50 m northeast of Showing #1
(see company website). Wildcat exposed this shear zone over a distance of approximately 40 m along strike in an
area that was highlighted by the results of two grab samples yielding 35.05 g/t gold (Au) and 3.53 g/t Au (see Press
Release, Sept 23, 2009). A total of 14 channel samples collected at 2.5 m intervals from this shear zone returned
assays of up to 6.21 g/t Au over 0.8 m and 13.41 g/t Au over 0.4 m (see Table 1). Seven historical drillholes
intersected gold in the vicinity of Showing #4 in concentrations of up to 10.55 g/t Au over 0.84 m core length (see
Table 2).
Showing #1 consists of intermittently exposed, sub-parallel gold bearing quartz veins, located approximately 300 m
northwest of the Jeep Gold Mine shaft and approximately 25 m west of the historical #3 vein underground mine
workings. Based on encouraging results of previously collected channel samples (see Press Release, Sept 23, 2009).
Wildcat conducted further stripping, exposing an additional 40 m along strike of the quartz bearing vein system and
uncovered a crosscutting shear zone, approximately 3 m wide, and a fold nose containing quartz veins with visible
gold. A total of 21 channel samples were collected along Showing #1 yielding up to 5.14 g/t Au over 1 m and 3.43 g/t
Au over 0.4 m (see Table 1).
Wildcat is currently planning a winter drilling program to investigate these and other gold bearing quartz vein systems
on the property.
Table 1: Gold Showing #1 and #4 Surface Sampling Assay Results
Showing Channel Samples
Channel Length
(m) Gold (g/t) Gold (oz/t) Silver (g/t)

Join the conversation about Wildcat Exploration Ltd.

Reply

Replies

  1. So if I read that right, they stripped 80m in total and found a 3m wide cross cut shear with a fold nose.

    Is that like a big knuckle? And with visible gold to boot.

    The width is getting bigger? From 1.3m to 3m wide on the cross cut, or does the vein keep going past the crosscut?

    Sorry, this wasn't all that clear to me, but very encouraging

    1. Should be interesting to see if the market picks up next week after the Manitoba convention.... Would be nice to see that vote of confidence come in as it is on SKP with investors picking up stock out of the market....

      Managment has to decide if they are going to be a perpetual wholesaler or in a retail market. Timing is right for the push into retail... not another placement which just increases overhang...

      What happens with these constant placements.... and happened with SGR for several years.... is that investors get on the wholesale treadmill.... it is only recently since SGR stopped doing PP that the stock has moved into new territory.

      There are some 20 million wts that will bring in $3.5 million if exercised.... another placement simply reduces the chances of those wts being exercised and holds a much larger wt position over the market untill they expire.... Little is accomplish from an investors standpoint untill there is significant moves in the stock price.... Then everyone benifits.. the investor and the company.

      Focus on driving shareholder value.... we can then execise and provide the cash instead of another placement..

      Promote rather than dilute!

      This is the opportunity the conference will provide.

      JMHO

    2. Andy, what shows up at surface is interesting, but it will take the drilling to determine what is down below. It will take drilling over an area and along a length to be able to create a picture of how the surface features develop at different lower levels. Drilling costs money, so it would make sense to me to do the shallow drilling first in order to extend the 3D model/map further. Once that data is tabulated and digested, it should then also help to shape the next round of drilling at lower levels, thereby reducing the cost and improving the probability of achieving better results when exploring further down.

      JMHO.

      NL

      1. NL, i agree on the shallow drilling, if they drill 5 holes at 500m, they will have their 2500m of drilling.

        Hotmuck, if you are reading, would it be cost effective to drill shorter holes if you are confident of mineralization in the first 500m?

        Or would you shorten the drill to say 250m? That would allow for more area to be covered by the drill, but since there really hasn't been any drill holes put deeper in this area, they could totally miss anythinig that may start deeper.

        yikes am I ready for this show tomorrow, i have way too many questions.

        ak

        1. I look forward to any commentary that any of you may have from the convention.

          Try and get some potatoes and veggies with that meat. IM starting to feel like a 6 yr old waiting for Christmas to come. I hope it's going to be grand results because in the end thats what it boils down too. Wouldn't hurt to get some meat from the poundmaker jv.

        2. I think they drill more holes at shallow depth to confirm continuety of vein structure.

          If they drill a series for 3 holes from each set up at 30, 45, an 60 degrees and these 3 hole sets of 75M, 150M and 250M or roughly 500M per set.

          Thus you would intersect @ Roughly 40-50M, 100M and 150 M depth.. 3 intersects will allow you to configure dip angle, grade , width... You need this to determine most efficent targeting for deeper holes.