Skip to content
Sign in

Post

Wits Basin

Prez3.6 rating from 60 members8.6K ptsRate

Pumps @ BH

Just talked to Dia Kelly (Lighthouse Communications). She reported that the new pump is in & working affectively with the much stronger motor running it. But she could not tell me at what level the dewatering is at. Sept 12th , the previous time I called her, the dewatering was @ 260 to 280 ft. So one would presume it is now lower but how much????

Also the negotitions are ongoing with adjacent proerty owners but due to this being a sensitive time in that development, nothing further is available.

Wonder how Dr Smith is spending his work days nowadays? Maybe his focus in Vianey or even FSC?

Join the conversation about Wits Basin.

Reply