Skip to content
Sign in

Post

ZEN Graphene Solutions

Replies

  1. Great work indeed! That would leave the analyses by some others, including some institutional ones, in the dust. In Geol_Pro's work, all the salient details are listed along with justification of the assumptions used. Hats off him.

    Noticed that he has dropped to "discount factor of 50%" in his 9 June conclusion, unless he wanted to throw away the contribution from the West pipe, just like I did from my showbox model (actually, a slice of a hard boiled egg squeezed in the box). My crystal ball said 27 M tonned ore for the East pipe using s.g of 2.7 and @ 5% Gr. If the number were adjusted using his values of 2.5 and 4.1% grade the my number would come down to approx. 1.0M tonnes of Gr (1.35 M tonne Gr x (2.5/2.7) x (4.1%/5%) = 1M tonnes). This is in the same order of magnitude with his number of 0.8 M tonnes of Gr. This 20% difference could be considered as the same, taking into account two different ways of looking at the deposit (for the East pipe only).

    As indicated, I threw away the West pipe just to be on the conservative side. And this (along with Geol_Pro latest value for the East pipe) would put a lower limit on the size of the deposit.

    This is a conservative way of derisking an investment.

    So, the only way is up?

    goldhunter