Skip to content
Sign in

Post

ZEN Graphene Solutions

Verified Optometrist3.5 rating from 625 members44.9K ptsRate

Roth Report

here is a link to the Roth Report where they did the NPV calculation:

roth2.bluematrix.com

On page 9, is where they state their key assumptions for their calculations. Their NPV calculations gave a share price of $10 which they discounted to $4 until they had derisked the project further. Their calculations were also based on ZEN finding 13M tons of raw ore. We are of course way past that with they excellent drill results we have obtained in the last few months.

It is not hard to see where this thing could easily be $50 in the next 12 months. My target share price is $50ish based on the following 2 methods:

From a cash flow perspective, company has said they could produce 100k per year. The resource size supports this easily and for decades. At $8000 profit (feel free to change this number to what ever you feel is comfortable for you), your annual profit would be $800M, at a PE of 4, that is $3.2B over 60M shares, that is $53.

From an Insitu value, 100M tons, at 4% yields 4M tons of end product. At $9000 value per ton, that yields $36B in resource at an 8% buyout rate over 60M shares, I get $48 per share.

Sitting tight and waiting for the fireworks!

G.

Join the conversation about ZEN Graphene Solutions.

Reply

Replies

  1. Start at the bottom and work your way up. It was live chat at TCC.
    16 Aug 13, 22:28
    hoov: Management will be prepared to ward off a hostile offer.
    16 Aug 13, 22:27
    hoov: With over 20% of shares in insider control, it is unlikely that a hostile bid will succeed. A friendly offer, i.e.one acceptable to management, will be a better price than a hostile offer, I would think. So, we'll get good value, in the end.
    16 Aug 13, 22:26
    hoov: As to whether Aubrey is entertaining buyout offers, I haven't heard of any. He's cautiously builiding shareholder value, while trying to determine the best possible use for this graphite.
    16 Aug 13, 22:25
    hoov: Anything below 1000 m is not really a big concern just now, as that would be already 20 years of production or more. It has no current value, really.
    16 Aug 13, 22:24
    hoov: That won't be useful as an economic parameter, but it will be part of the total tonnage.
    16 Aug 13, 22:24
    hoov: The deep holes would be guided from the drill results, as they'll be modeling the pipes as they go. A couple of holes right down the pipe will give an inferred resource of significant size.
    16 Aug 13, 22:23
    hoov: The 40-hole program I'm assuming is to do a resource to indicated standards on the top 400-500 metres of the two pipes. That would be the obvious open-pittable material.