Takenotes, your excellent work on this DCF Model should be very close to the actual PEA in my view.
My work also shows for a similar high IRR, Rate of Return at 106% vs your 103%. You will be hard pressed to see this type of number in any mining type operation. (40-60% would be considered exceptional)
ZEN Rate of Return could be much higher than even my forecasted 106%, based upon Capex and AISC for Mining/Processing Totals being high at $400M, and with forecasted returns based on $8500/t product being low, for pre-Tax profit $425M.
What if,…
- Recovery is 98% (instead 80%) and Processing at $600/t plus Mining Costs (big reduction from my $2000/t and $100M/yr figure)
- My $200M Capex may be lower too (ie., Focus Capex $126M – but no caustic roast, ZEN Processing is for Crushing, Flotation, Caustic Roast)
- A Higher than $8500/t Finished Product Price
- The $100M Overburden Cost is a fixed expenditure in only year 1 and is insignificant if expended over LOM 25 years.
Increasing the Recovery Rate with possible higher end-Product prices, and while lowering Capex and Processing costs, would dramatically increase the IRR for this project. I don’t think the Mining Industry has ever seen returns like the one’s Zenyatta will present for this near term PEA. 106% may be way low!
What are we missing,…
My concerns are additional costs for Infrastructure. Costs for All-season road (4-5 km), Power (constance Lake or Hearst), Natural Gas (Same as Power). Water is not an issue in the area, an over abundance, however a facility will be needed for clean water, storage and pumping facility.
Look forward to this PEA release which should capture the markets attention in a positive way.
Cheers, Mark