Skip to content
Sign in

Post

ZEN Graphene Solutions

Treasurer4.4 rating from 31 members312 ptsRate

Zenyatta DCF Model

In anticipation of the PEA, I've put together a DCF model for Zenyatta. This is an updated version to the one I posted to TCC the other week. In order to validate the accuracy of my model, I re-created the Focus graphite DCF from thier PEA done by RPA. I was able to come withing $1M or so to the NPV & within .1 of thier IRR. I've attached that model below as well for you to see. I then worked from their to build Zenyatta's using what I believe to be conservative assumptions and costs a little bit higher than what was provided in the 43-101 Resource Estimate. (Note: use the scroll bar to see the full image)

Just saying....

Zenyatta DCF Model

Focus DCF Model

TaKeNoTeS

Join the conversation about ZEN Graphene Solutions.

Reply

Replies

  1. Takenotes, your excellent work on this DCF Model should be very close to the actual PEA in my view.

    My work also shows for a similar high IRR, Rate of Return at 106% vs your 103%. You will be hard pressed to see this type of number in any mining type operation. (40-60% would be considered exceptional)

    ZEN Rate of Return could be much higher than even my forecasted 106%, based upon Capex and AISC for Mining/Processing Totals being high at $400M, and with forecasted returns based on $8500/t product being low, for pre-Tax profit $425M.

    What if,…

    - Recovery is 98% (instead 80%) and Processing at $600/t plus Mining Costs (big reduction from my $2000/t and $100M/yr figure)

    - My $200M Capex may be lower too (ie., Focus Capex $126M – but no caustic roast, ZEN Processing is for Crushing, Flotation, Caustic Roast)

    - A Higher than $8500/t Finished Product Price

    - The $100M Overburden Cost is a fixed expenditure in only year 1 and is insignificant if expended over LOM 25 years.

    Increasing the Recovery Rate with possible higher end-Product prices, and while lowering Capex and Processing costs, would dramatically increase the IRR for this project. I don’t think the Mining Industry has ever seen returns like the one’s Zenyatta will present for this near term PEA. 106% may be way low!

    What are we missing,…

    My concerns are additional costs for Infrastructure. Costs for All-season road (4-5 km), Power (constance Lake or Hearst), Natural Gas (Same as Power). Water is not an issue in the area, an over abundance, however a facility will be needed for clean water, storage and pumping facility.

    Look forward to this PEA release which should capture the markets attention in a positive way.

    Cheers, Mark

    1. What are we missing,…

      My concerns are additional costs for Infrastructure. Costs for All-season road (4-5 km), Power (constance Lake or Hearst), Natural Gas (Same as Power). Water is not an issue in the area, an over abundance, however a facility will be needed for clean water, storage and pumping facility.

      Look forward to this PEA release which should capture the markets attention in a positive way.

      I actually don't see production cost or infrastructure build as an unknown at this point. We know at $8,500 this will be a cash cow mine and obviously if the average sales number is $15,000 the numbers will just be almost unbelievable.

      To me the only question is the revenue number. For the 43-101 they used $8,500 and that seemed to catch some people by surprise as they were no announced off takes to go by. Even with that number we know it may be very conservative as the Company is targeting the $16K + market. But, and this to me is the unknown, what is the annual size of each sales level? If you have a 100,000 tonne per year mine but can only sell 2,000 tonnes over $16K and say 25,000 tonnes at $10K, etc. does it make more sense to only mine 50,000 tonnes per year as there is more value in delaying the output? If this was a gold mine, the optimum mine output is driven by recovery and mining cost/efficiencies.

      For this project, the margin is so high, the optimum annual output will be driven by the value and number of off takes.

      Here is another idea. If you are a graphite user and are currently paying $20K per tonne and using 40,000 tonnes per year. Why mine more than that and sell it for less or far less than the $20K, just mine for your own use and 'save' yourself $18K per year (based on $2K production costs).

      I think most people and this probably includes institutional buyers can't get a handle on this. So it will be interesting to see what number they use in the PEA and where they can show prooof of the sales number. This to me is the only unknown of any consequence.

  2. Great post TakeNotes, wish I could still read your posts so I really appreciate you posting here. Very nice work and careful preparation. Especially nice to see the comparison with Focus, this is useful.

    So if one compares the current Focus price it is trading at only 16% of the NPV8 from their PEA so market is still really discounting even after a PEA. However if one compares your numbers for ZEN 16% of the NPV8 = $400 million which converts to a SP of $6.66 so even if we get a market bump to what Focus is trading at we are looking at a double+ with the PEA in hand.

    Hard to believe anyone would sell at this point.

    Thanks again.

  3. Hi TN,

    Would it be possible for you to post this analysis on SH? I think it would be extremely useful information for people there too and not everyone is on both boards.

    Thanks

    Ron

  4. TaKeNoTeS used the Focus PEA to compare to ZEN numbers. Today, Focus released the Feasibility Study. Of relevance old PEA numbers compared to the New Feasibilty.

    PEA

    Highlights: $317 million NPV (8%); 32.2% IRR pre-Tax;

    (ZEN Projections: NPV $2.468B, yes Billion; IRR 103% pre-Tax)

    Feasibility

    Highlights: $383 million NPV; 30.1% IRR; operating costs of $441 per tonne

    “The study was based on a 25-year mine life that produced a Pre-tax Net Present Value (“NPV”) of $383 million calculated at a discounted cash flow (“DCF”) rate of 8% Pre-tax, the financial model has an Internal Rate of Return (“IRR”) of 30.1% and a capital payback period of 3.0 years.”

    Full NR, http://www.focusgraphite.com/focus-graphites-lac-knife-projects-benchmark-feasibility-study-reports/?utm_source=delivra&utm_medium=email&utm_campaign=Gold+final+6%2D25%2D14

    Cheers, Mark

  5. Thanks TakeNotes -

    As had been suggested earlier by others - Pre-tax IRR of 103%.

    Wow!

    Does anyone else have an IRR like this?

    What will the market pay for a share of this company?

    Perhaps I'm using the wrong numbers but a Pre-tax NPV @ 8% = $2,486,412,124.

    Divide that by 60,000,000 shares = $41.14.

    Is my methodology incorrect?

    - panamax

  6. Mr Market sure doesn't get "DCF", a discounted cashflow analysis or even Resource Estimates, when this market prices ZEN at $157M market cap.

    That's only 18,500 tonnes of end product (suggesting a total resource of only 371 KT's) and Whittle err's on the conservative side, as our resource is 45.2 MT's at 3.14% avg grade for 1.418 MT's end product, that by most accounts, including the Hoov, is a Model 20% to 40% Conservative.

    Lack of Analysts I suppose, except for Roth, which has put out some realistic type numbers out.

    All the more important this PEA, for a better valuation especially for when the next round of funds/financing will soon be required (min $5M)

    Cheers, Mark

  7. This is amazing. Thank you for sharing it with us.

    Do you think the 240M Capex will be come about from debt or another equity offering?

    1. AE has stated several times that they will not build this mine, they will sell it to a miner. Having said that, if they did go the mining route, in today's world $240M is a small capex number and knowing the Board's sense of non-dilution of shares they would probably go with the debt route. There would have to be off-take agreements in place to secure financing but given how profitable this project is (at this point), the loan payback would be under 1 year. That would be a loan that would be easy to secure.

  8. The pre-tax rate of return is very impressive. And its this rate of return that I think will have other mining companies wanting the Albany graphite for its own. Nice to see you use $8500 selling price as I've seen some higher figures elsewhere on the web which may or may not happen. Thanks for sharing the info.