  1. The genereal feeling is it might be but that would be dependant on (a) the mine plan (b) the selling price and (c) the cost.

    The 1.4 Million tonnes was seen as conservative in the 43-101 but really no one is looking at this number - it is the cost and selling price that everyone wants to see.

    At the current resource, that is 20 years at 70,000 tonnes per year. Anything more than that does little to the NPV.

    1. I_C_ I don't understand why you say that an increase in the resource does little to the NPV. Just doing a quick calculation, I believe an increase of .4 MT has a possible increase in share value of several $/share all other numbers being equal. I have used the $8500 of price per ton and $2000/T cost of production so yes those do have a large affect on the NPV but so does an increase in total tonnage. A change of just one or two $ per share is a big deal depending on the # of shares held. JMO the deputy

      1. I think it has been mentioned before the 43-101 Whittle Model (Sp) itself is a conservative model, so yes resource should be higher than 43-101, and that would add to the mine life and NPV. IMO

        1. One would think that Zen could get more than half a billion ($10) for a resource already estimtaed by the 43-101 to be about 12 billion (8500 x 1.4 million). If the price per ton and resource grows in the PEA then we are talking about the mine worth lots more than 12 B.

          1. Just a few remarks to add to your post for clarification purposes.

            - This is not intended to split hair but $0.5B would translale to $500M/55Ms = $9.09/s (usually rounded down to $9/s, rather than a more generous $10/s; if it were $9.9/s then it would be fine to round it up to $10/s).

            Also, we need to specify if this is an "above ground" or in-situ value (in the ground) since the above ground value would be assigned as just a few % of the in-situ value. The % would depend on the nature of the deposit (costs to bring the stuff up to the surface, milled and refined to get a certain price such as $8500/tonne).

            - The resource estimates were approximately 1M tonnes indicated and 0.4M inferred for a total of 1.4 M tonnes total as you have indicated. But the inferred amount is not allowed to be used in a PEA, so it would be conservative to use 1M tonnes in the valuation of the deposit. We can certainly keep that potential 0.4M tonnes in mind to have a warm feeling, but the buyers (in a TO) would normally ignore this in their price negotiation.

            1M tonnes x $8,500/tonne = $8.5B (or $12B, including the inferred) would be the worth of the deposit in the ground (in-situ). As indicated this deposit would have to be brought up above ground (mined), milled and refined to get a product that can be sold for, say $8,500/tonne.

            - In-the-ground value: $8.5B/55M shares = $154/s (nobody would pay this price).

            - Current value given by the market: $1.4/s (we are buying and selling at this level).

            So, what would be a reasonable value for us shareholders to accept in a buyout? 10% of the in-situ value of 10% x $154/s = $15.4/s ? At 5% it would be $7.7/s, etc, etc...

            Would $10/s be a reasonable value for ZEN? I would certainly not waiting for $100/s level, even $50/s level. As indicated, $15/s is just plenty for me. Others may scoff at this price and wait for better ones. Each person on his/her own.

            Notes: The resource could be increased by further drilling, since the deposit seems to be open at depth, but the current conceptual pit is deep enough to extract the desired amount/year, for approximately 20 years. There are a few factors that miners would consider:

            - the depth of the pit: miners do not want to make it too deep, more overburden and waste rock to remove; apart from the cost. Also, a big hole would normally be more difficult to justify from the EA point of view. These days, a preferred mode would be an UG operation (out of sight out of mind mentality).

            - addition resource: It's good to have a larger deposit in the ground, but a main advantage would be the extension of the life of the mine. Quite often, there is a limit for the production, i.e. one cannot overproduce, since the price of the product is dictated by supply and demand principle (e.g. current oil price). In addition, if one has good stuff, but production is limited (e.g. Sri Lanka) then little profit would be expected, hence would not be a good investment opportunity.

            There are potential graphite mines in Canada with all kinds of predictions/ambitions, but production rate, so many tonnes/year, is a number worth checking, to size up their potential profits.

            goldhunter

            1. Replying to @goldhunter11

              From your last post GH:

              - The resource estimates were approximately 1M tonnes indicated and 0.4M inferred for a total of 1.4 M tonnes total as you have indicated. But the inferred amount is not allowed to be used in a PEA, so it would be conservative to use 1M tonnes in the valuation of the deposit.

              Inferred resources are included at the PEA stage as per the following document from RPA page 33

              http://www.rpacan.com/site_Files/Content/Downloads/NI_43101_In_Perspective_for_Investors.pdf

              Glorieux

              1. Replying to @Francis Dube

                Glorieux,

                This is a controversial topic. I have seen and raised this question with other companies regarding why they did not use the inferred in their PEAs, and the general replies were this was not allowed, or they just want to be on the conservative side, since they may not be able to defend the inferred values (and could end up facing a class-action).

                I found one link here that provides some discussion on this topic and they quote the Canadian Security Admisnistrators (CSA). Part of that is pasted below.

                http://www.osler.com/NewsResources/Default.aspx?id=4849

                -----snip-------

                "One of the key attractions of a PEA is the specific exemption for PEAs from the normal prohibition on economic analysis disclosure that includes or is based on inferred mineral resources, the weakest of the various CIM categories of mineralization. That exemption is subject to certain conditions, including the use of a prominent disclaimer and the inclusion of disclosure regarding the impact of the PEA on the results of any pre-feasiblity study (PFS) or feasibility study (FS) that exists in respect of the same project, but nonetheless provides an opportunity to provide a portrait of a project’s potential based on inferred resources. That opportunity disappears once the project advances to a PFS, which must be based solely on higher categories of mineralization. As a result, there may be a temptation to retain what is nominally a PEA in place notwithstanding the progression of the project to a more advanced stage, in order to retain the ability to provide economic analysis based on inferred resources." (underlined mine)

                ------snip------

                RPA may choose to include the inferred in that PEA that you referred to, but they would need to include a prominent disclaimer (did they?).

                There may be other examples for either ways (include with a prominent disclaimer or not include), but I would take a consevative approach not to consider the inferred in the valuation, keeping in mind of course that it's there and may be available later once they have more drill results to back it up (since the regulator will require this when they advance past the stage of the (preliminary economic analysis) PEA toward a final version.

                Yes, I would take anything above $10/s (15 or 20 is just dandy), but I am not brave enough to aim too high, since the aiming too high may set one up for a hard fall (I still remember a 30% drop in the SP, just a few days ago, following the last NR).

                Each person his/her own. GLTA.

                goldhunter

                1. Replying to @goldhunter11

                  Yes, I would take anything above $10/s (15 or 20 is just dandy), but I am not brave enough to aim too high, since the aiming too high may set one up for a hard fall (I still remember a 30% drop in the SP, just a few days ago, following the last NR).

                  I would agree with this. And in all likelihood we wont have much chance to decide. Even an breathtaking PEA is not going to take this stock above $10 or anywhere near it. It would take a buyout, a startegic partner or maybe an off take. I still remain somewhat astonished that no one has taken a run at this yet. But I guees it is not how this graphite market works. I do know that I dont want to wait around several years for ZEN to build and finance a mine. We need to find out what the post PEA plan is.

                  1. Replying to @I_C_Deadpeople

                    ICD,

                    Your post says: "It would take a buyout, a startegic partner or maybe an off take."

                    Quite true!

                    Unlike other business like gold, a graphite company would need to line up potential customers for its products. This is even more important than financing, since there would be no point to try to arrange financing for building the mine and required facilities to produce the stuff if there are no buyers. Usually, these things would be intertwined. A strategic partner, e.g. a big name marketer or producer of high quality batteries for e-cars or storage applications, could be the same entity that would provide (some/all) financing and take part or all of the products. Once this is lined up, the graphite company may go to the market for equity financing for the balance, if required.

                    A takeover could come from an integrated producer that sees the potential of the company and its graphite products. I would also hope that a TO would occur within the next 12 months. Others may have more patience.

                    goldhunter

                    1. Replying to @goldhunter11

                      ICD, you write

                      I still remain somewhat astonished that no one has taken a run at this yet. But I guees it is not how this graphite market works.

                      Allow me to speculate about what the reason might be. First question is who would be the potential bidders for ZEN. I suppose there are three potential bidders, miners, graphite producers and end users.

                      The issue that keeps miners from bidding might be, that their business is to mine e.g. a mineral with fairly standard properties, and sell it on the open marked via intermediaries to unknown end users. In general miners don't worry about producing the end product and selling it to end users, hence this is not their core business.

                      The thing that can make ZEN attractive for a miner is, that they have Charhar and Yamashita on board taking care of the production process and marketing. So with an optimized flow sheet and a proven large scale production process, and off take aggrements, the issues that are probably keeping miners from bidding IMO would be mitigated.

                      I suppose ZEN has taken care of the marketing issue first, sending samples to end users for testing, before negotiating price and quantity - and this is the easy part. After the testing, IMO it's a pretty straightforward negotiation.

                      After confirmation about the buying interest, and the specifications required, AE has been able to be specify the desired production process to SGS, who then have the job to develop the production proces - which is the hard part, and time consuming. From what we know from the news releases, and your conversations with AE this work should be well under way, so there is nothing that suggest problems.

                      We know from the latest NR that the optimization work is exessive compared to what's normal for a PEA, and I suspect that the reason is that it is a very important mile stone for derisking the Albany graphite, as it is probably what's keeping miners from bidding for ZEN, because with the issues of production and sales resolved, the remaining issue is how to get the stuff out of the ground.

                      The producers of synthetic graphite are IMO not potential bidders for ZEN. My presumption is that they are the competitors. As far as I remember, the annual output from Albany wil only cover about 1-2% of the current demand. Add to that an annual increase in demand of 7-10%, and the the result is that the output is not big enough to disrupt the market conditions for synthetic graphite. ZEN will be nothing more than a nuisence as it will have not influence on the pricing and hence will be ignored, as the the producers will stick to their core business of producing synthetic graphite via e.g. thermal treatment. Buying ZEN would cause them to loose focus and would not provide a desive competitive advantage towards their rivals.

                      It's harder to predict if end users would be interested in bidding for ZEN. I suppose end users generally buy the graphite to their specifications, so they would not know how to produce the graphite themselves. Consequently they would probably not want to bid until the production process was resolved, just like the miners. If an end user could buy out Zen at an attractive price, let's say 0.5-1.0 billion, it would surely provide him with a significant competitive advantage towards his competitors.

                      But if the end user is not a miner allready, he would have to partner with a miner to get the graphite out of the ground thus complicating the operation, and he would have to build and run a production/upgrading facility that would not be his core business.

                      Another issue is the question, would an end user be able to use all the graphite from Albany?Let's say the end user is currently buying synthetic graphite from a producer to a specific set of properties. I suppose the end user might end up with some (or a lot) of graphite that doesn't suit him, that he would have to sell to other end users, and they might not want to buy from him, as it meant giving away the specifications they require for their products to a competitor. Just speculaing here, but if he graphite is purified in a specific way, wouldn't there be a byproduct?

                      Yet another issue for an end user, would he want to be stuck with a graphite deposit, if the technology changed so that graphite was no longer required for his specific product? I mean, graphite might still be used for a large variaty of products, so he could sell the stuff, but he would have lost the competetive advantage, that was his motive for buying the deposit in the first place. For that purpose, an end user would probably have to be pretty sure that he was going to need graphite for the next 20 years, and if we think about the rapid technological development, that might be a hard bet to make. So the risks for and end user might keep him from bidding.

                      So we are back to the miners as my best bidding candidates, who will be free to sell the graphite to a large number of end users suited to their speific needs as they might change over time.

                      However if the miners don't want to be stuck with a deposit whose value might drop significantly due to disruptive technologies either, we might find ourselves owning shares in a company that just ends up having to mine the graphite itself, which right now probably would be an extremely profitable operation - but a long way away for us investors, as most of us would probably want to see a bidding war for this gem.

                      Again all just my speculation.

                      Best regards DRA

                      1. Replying to @dra

                        Good analysis DRA. But if one of the end users is already a miner and he can save $10,000+ per tonne by simply mining versus buying and he "only" pays a Billion for the shares and the mine cost - his payback is only a few years, he does not have to worry about 20 years down the road. In that sense, the only explanation for holding back would be waiting for the production process to be finalized.

                        I guess another thing we do not know is - what is the amount of synthetic each of these 25 NDA companies currently buys? That would be a huge factor in there own thinking about the cost savings to purchase. Much different for a 25,000 ton user versus a 80,000 ton user.

                        Hopefully once the PEA is out, we are done with the cone of silence and we can promote this thing.

                        I think we all thought that with a June 30th PEA the sparks would fly in fall. So now they should happen in spring.

                      2. Replying to @dra

                        The thing that can make ZEN attractive for a miner is, that they have Charhar and Yamashita on board taking care of the production process and marketing. So with an optimized flow sheet and a proven large scale production process, and off take aggrements, the issues that are probably keeping miners from bidding IMO would be mitigated.

                        I do recall that AE told me in Septenber that whomever does take over the Company I hope they are smart enough to retain these two guys.

                        Geez, how do you increase font size?

                      3. Replying to @dra

                        DRA,

                        Very thorough and well-thoughout "speculation". Quite enjoyable!

                        I would add one speculation to your top of the list candidate, miners.

                        Take Panasonic/Tesla as an example (just as an example for discussion purposes). If they like what they see and Albany graphite quality of the graphite would be suitable for their goal in term of a stable supply of high purity graphite for their battery production for the next 10 years, then they would go for it. They are big companies and have the resource and connections to determine if Albany graphite is good for their applications with the samples (standard size, or larger if required) provided by ZEN.

                        I see three potential options.

                        1. Buy up the entire company, move their people in and develop the Albany project as part of their (international) holdings. ZEN would disappear and we would end up having the cash or the shares of the new company, assuming that it is at an acceptable TO price; or

                        2. Buy the entire ZEN and make it a private 100% subsidiary, with some changes at the top. AE is not a miner and he has no desire to become one, so he would be happy to vacate his seat and walk away to the bank to park his money and contemplate his next venture. Even at 10/s his fortune would not be that bad...a cool $50M. Albany deposit would be mined, milled and processed producing the god stuff for Panasonic/Tesla.

                        3. Be a strategic partner (say a 51% control) providing the bulk of the financing, including debt and equity, and take all or part of the graphite output as payments. ZEN the miner would prosper if the profit can be shown to be excellent for it to retire the debt in a short period of time. Once the debt is paid off the suiter can begin cash/share payment for the products. Keeping ZEN as a public Canadian company may have some advantage including the ability to raise money from the market. This could be one way to derisk an investment for the suiter.

                        Just a few suggestions. Hope that Panasonic/Tesla are reading the BBs. Ho, ho, ho...

                        goldhunter

                    2. Replying to @goldhunter11

                      "Unlike other business like gold, a graphite company would need to line up potential customers for its products. This is even more important than financing, since there would be no point to try to arrange financing for building the mine and required facilities to produce the stuff if there are no buyers."

                      And according to past and the most recent report, this is exactly what the Zen brass are doing. Hence the additions to staff of those with just these skills. I would say that, strategically, our leadership is right on the mark. The other variables beyond the team still weigh significantly obviously. We wait to see.

            2. Replying to @goldhunter11

              1M tonnes x $8,500/tonne = $8.5B (or $12B, including the inferred) would be the worth of the deposit in the ground (in-situ). As indicated this deposit would have to be brought up above ground (mined), milled and refined to get a product that can be sold for, say $8,500/tonne.

              - In-the-ground value: $8.5B/55M shares = $154/s (nobody would pay this price).

              - Current value given by the market: $1.4/s (we are buying and selling at this level).

              So, what would be a reasonable value for us shareholders to accept in a buyout? 10% of the in-situ value of 10% x $154/s = $15.4/s ? At 5% it would be $7.7/s, etc, etc...

              Would $10/s be a reasonable value for ZEN? I would certainly not waiting for $100/s level, even $50/s level. As indicated, $15/s is just plenty for me. Others may scoff at this price and wait for better ones. Each person on his/her own.

              So correction

              1.5 million tonnes equates to 12 billion dollars assuming $8500/t - equates to $218/share.

              Assuming 10% in-situ value that would equate to $22/share. Then you should be satisfied with $22/share, not $15.

              Now, we are all or most of us are assuming $8500/tonne. The PEA will determine how much per tonne..

              It may be worth much more than $22/share. But the question is, how much will the offer be, and how much will ZEN management accept?

              1. Replying to @money75

                As stated in the 43-101,the company had mentioned a price of $8500 P/T for Zen graphite.

                Is it for product in the ground or for a finished product?Any one?

                1. Replying to @siegfried

                  My understanding it's always the price for a finished products on the ground after milling, processing at the mill, and further processing/purification to bring the product to various price levels, depending on the requirements.

                  One company indicates run-of-mill concentrates of ~94% after flotattion and minor processing including drying would fetch over 1000/tonnes, the price would depend on the size on the flakes. This is the product coming straight out from the mill. Further upgrading (acid, or caustic) to improve the carbon content would fetch more money. If the product is upgraded to high purity battery grades then they would expect $4000-8000/tonne.

                  For ZEN, I would say the $8,500/tonne is a conservative number in ZEN's view for its product after the caustic bake. But, ZEN will have to come up with a number (could be better) in the PEA. Just a guess on my part. ZEN could be contacted to confirm this.

                  goldhunter

      2. Once you go out 20 years at a discount rate of 5-8% the NPV gets diluted to nearly nothing. If the annual production rate was higher than say 50,000 tonnes then you may need more resource to fill the 20 year supply chain. Obviously, if a higher price is used and/or a lower cost then more resource becomes economic (not to mention the open at depth idea).

        For the NPV to go up substantially the annual production rate would also have to go up. This is a number we do not know. But higher pricing and lower costing would be the two greatest factors in the NPV at this time.

        Again, because of this secretive market, we don't know how much we could sell each year and at what price. So the production rate is an estimate.

        If this was gold mine, you would simply increase production knowing full well you could sell the product at market prices.

        1. Synthetic market is 1.5M tons/year so even if zen were to produce 50,000 tons/yr, that is only 3.3% supply to the market, not out-of-line.?