From the ZEN AGM discussion,
“AE stated that the end users won't make any moves until the PEA shows it is economic. So, i thought, why would they care if it is economic or just break even? As long as they get their product at the agreed upon price (Off-Take)do they care whether it cost $1K or $7K per ton to process? They (A Buyer)would only care if....well you can figure out the answer.” IC
My additions in Bolded Red. I believe it is “Potential Buyer(s)” who insisted on more detailed “Flowsheet” development (Pilot Plant) than we had in June, and more completely optimized, for determination of further accuracy of “Processing Costs” for Plant and Equipment, better than a PEA’s normal +/- 30%.
First Delay 18 June
Back in June, we only had a proven Bench Scale Process and associated Flowsheet for the 2x 5T Bulk Sample material, the same Bench scale process that was optimized to 99.97% with some samples 99.99% back in 2013 (25 April) using Drill Hole #5 core. (Grind – Flotation 40-70% – Caustic Bake)
-
Did a Potential Buyerrequest the need for more precise processing costs on a larger scale ie., Pilot Plant?
-
We know the 20+ NDA Company(s) requested individual samples of high purity product to meet their own specific specifications (accomplished by Sept)
By 02 Sept, Pilot Plant and Met Testing was completed
-
AGM Slide 13/30 showed 30 Kg of High Purity Material had been processed in the Pilot Plant Flotation Testing
-
Floatation was optimized to 78.3% Cg concentrate (source 16 Dec NR)
-
Grind – Float 78.3% - Caustic Bake – NaOH Recycling
By 16 Dec, Pilot Plant Float was optimized to a higher 92.5% Cg concentrate which deemed NaOH recycling unnecessary.
Grind – Float 92.5% Cg concentrate – Caustic Bake
16 Dec NR Highlights
• A higher grade flotation concentrate of up to 92.5% graphitic carbon (‘Cg’) was produced compared to the previous 78.3% Cg concentrate; • For the first time a fully engineered purification process has been completed providing data for energy requirements, water treatment, reagent consumption & equipment sizing;
• Optimization of NaOH consumption was achieved such that re-cycling was eliminated thereby reducing costs related to introduction of re-cycling engineering & equipment; • Significant (~86%) reduction in the NaOH reagent dosage;
• A technically feasible & distinctive process flow sheet was developed and work continues to fully optimize it to meet customer expectations on purity.
Now a Better Process, with Optimized Flotation and no requirement for NaOH recycling for a Cheaper Overall Processing. I believe ZEN now has enough information via Flowsheet to determine more accurate Process Costs “Very Soon” for the PEA if not a Buy-out before. Below, included latest Focus FS from Aug/14 for Operating Costs and the SH argument for May/June. Cheers, Mark
Focus FS Operating Costs per tonne:
Mining $126.95, Processing $239.37, Admin/Infrastructure/Tech Services $74.70, Total Avg Op $441.02
Process Equipment
The process equipment list was derived from the flow sheets. For major equipment, based on data sheets, data tables or technical description, budget prices were obtained from qualified suppliers for more than 80% of the value. The remaining equipment was estimated from databases from recent similar projects or in house cost estimation.
SH argument for May/June, imo questionable re: Highlights of 16 Dec NR and AE comments “Very Close”. Cheers, Mark
So why do I believe you will not have a PEA till May/Jun?
Its easy. All the samples up till now are either damaged or otherwise. The same samples that AE proclaimed that THERE IS NO MONEY IN CONCENTRATE so went designer.
SGS DOES NOT DO DESIGNER. So my bet is the 7-46 micron grinding is being called "designer"!
So he has three options. Release a PEA with a poor price per ton. Or wait for any new samples from new flow sheet to be tested by end users MAY/JUN.
Or thirdly drill more in spring and do a production level test with the new flow sheet and see what you get.
Have a nice day.
Read more at http://www.stockhouse.com/companies/bullboard/v.zen/zenyatta-ventures-inc#RrW5OvgV5fPgOlpB.99
ceosss wrote: The bolding didn't come out very well. Specifically, I'm wondering about this line:
All the samples up till now are either damaged or otherwise.
Can you elaborate?
Read more at http://www.stockhouse.com/companies/bullboard/v.zen/zenyatta-ventures-inc#RrW5OvgV5fPgOlpB.99
the_Chief wrote: Of course I do not know that for a fact. However, its the premise I have used since seeing the crystallinity tests in 2013. ??? That NR led me to believe that they had flow sheet issues.??? I would suggest that the new flow sheet is "more viable" then the last one. However, the mere fact that AE avoids telling you what flotation numbers actually are makes me still suspect its not "viable enough" ie. UP TO 92.5%".
So if the purity is not up to client specs yet at 99.95 then my assumption still is, that its not the purity at all. It is the flakes have been ground sufficiently to destroy the characteristics of the flakes.
None of you even bother to think what the NR meant. How can a graphite be nuclear purity, yet not pure enough for your clients? Easy answer they tossed in the word purity so you would not realize that they really meant characteristics. I figure they ruined the conductivity and resistivity numbers
Read more at http://www.stockhouse.com/companies/bullboard/v.zen/zenyatta-ventures-inc#RrW5OvgV5fPgOlpB.99