Emerging Graphene Technology Company

Hydrothermal Graphite Deposit Ammenable for Commercial Graphene Applications

Free
Message: Email from Zenyatta

After speaking with Sandra yesterday at ZEN, she has confirmed to me that the Chief is full of crap. His theory that zen needs to do more drilling to repeat the samples sent out earlier is just a bad "guess" I asked her point blank if Zen would be going back to the graphite site to continue drilling for more material to carry on with the optimization flowsheet. She said "No... There is no need for any more graphite at this time." The Chief had come to the conclusion that Zen would be drilling in the spring before a PEA could be released...obviously if the drills are on site to drill the 4E target, it would be practical to keep on drilling if more material is required. Hang tight people, you have come too far to get swept aside by the wave of noise out there.

Share
New Message
Please login to post a reply