Skip to content
Sign in

Post

ZEN Graphene Solutions

The post this replies to is no longer available.

Mail Room1.8 rating from 35 members130 ptsRate

Re: Repost from CCB hub

"Zen has also taken x2 5 tonne samples well over a year ago, one from each of the Hydrothermal Pipes, (not the Vein type at Millar which is similar to Sri Lankan) for Metallurgical Testing......."

So, is that a total of 10 tonnes (x2 5 tonnes) of ore?

This would imply that Zen could theoretically produce roughly 400 kg of graphite (4% grade, 100% recovery), does it not?

Any idea how much has been produced and how much ore is left to support the continuing SGS metallurgical work?

Join the conversation about ZEN Graphene Solutions.

Reply