Skip to content
Sign in

Post

ZEN Graphene Solutions

Treasurer2.4 rating from 46 members998 ptsRate

Larisplast

It has been 6 month (May 25th) since the ZEN NR on the next phase of testing at Larisplast.  6 months and not a word of anything from this testing.  Did it not take place?  If it did, what are the results?  Nothing nada.  Same with the last phase of Ballard testing.  AE is not the one to take us to the promise land.  The BOD needs to make the change.

Join the conversation about ZEN Graphene Solutions.

Reply