I could only find the following:
Massicotte/Detour Lake: 1 drill hole. This campaign was cancelled due to a major technical problem. Assays are pending. Alternative solutions have to be found in order to resume drilling in 2009.
What was the technical problem and did the assays come through?
Any one any info?
Thanks