Running solution
Does anybody know how long it will take to produce gold from time of solution application?
It sounds like firstgold will be missing their mid-December pour target.
Join the conversation about Firstgold Corporation.
ReplyDoes anybody know how long it will take to produce gold from time of solution application?
It sounds like firstgold will be missing their mid-December pour target.
Join the conversation about Firstgold Corporation.
ReplyThis is from the last NR:
Founder/COO Scott Dockter commented, "We anticipate that we will be crushing and stacking ore within the next ten days, we will then apply the fluids and would expect to begin processing the solution through our plant in December. This is a big transition for Firstgold Corp. We have good people who have worked very hard to make this happen and we are very excited to have these crushers up and running."
I think the Dec deadline stated was for processing, not pouring. FGOC's Philip Bosley stated that he will be shooting another video next week to feature progress with production. As to the production to pour timeline? I would think they are going to have to run in through to answer. Each plant has different capacity. Perhaps someone who did the site visit has more insight?
Moose I agree, they stated that Nov and Dec deadlines previously for gold production at 3000 OZ, as I recall they had traches of financing depending on it. Unfortuately the quote I gave you was from the last NR. Solution should be going on the pads VERY soon, and that process takes a while at 3000 gals/hour. Can't process the gold until in collects on the carbon filter. The gold can't be collected until the solution has been put to the rock and the precipitate makes it way to the filters. So this process will take a while, bugs must be worked out with the new system. Permits pending for some of the plant processing equipment, etc, etc...
Delays vs previous NRs, yup, but what are we dicussing now? It is not starting to sound like a gold PRODUCING company...
What I am discussing is a company that is failing to yet again meet deadlines.
Has never adequately addressed the NR, I've asked company officaials with no response.
The company had previously stated that ALL permits were in place, so your comment is not reassuring.
If they have a delay in pouring I would anticipate the share price below .10 and then all bets are off for ever getting back to previous highs next year.
This is an overview of the ore processing documented on the Newmont website. FGs process may vary to some degree, but the basics are the same. FG should be through with the current crushing process, have and/or are creating a slurry. *Cyanide solution should be next, and they should be applying it soon. I Don't know how long the next steps take, but I would bet they are racing to pour by years end. Nor do I know what FGs annual capacity will be. I welcome corrections, comments complains and editorials...
At the Processing Plant, gold and silver are extracted from the ore. Ore processing consists of the following stages: The Processing Plant has the capacity to treat up to 1.3 million tonnes per annum of ore. These stages can be described under three main headings: Ore processing is a 24 hour operation. Ore is stockpiled (1) at the Processing Plant, and the process begins by feeding the ore into a hopper with a loader. The ore is conveyed, and lime is added (2) to raise the pH of the ore. Following crushing through a jaw crusher (3), the ore is fed into the semi autogenous grinding (SAG) mill (4) along with water and steel balls. The grinding process reduces the rock to a slurry. The SAG mill is a large revolving cylinder. Rock is ground by the turning action of the mill, and impact from the hardened steel balls and the rock itself. In order to ensure that the rock is ground finely enough the SAG mill has a trommel screen (5), which acts like a large sieve. The oversize rock (SCATS) is caught by the trommel, along with the worn hardened steel balls. This material is fed past a magnet (12) to separate out the steel balls. The oversize rock passes through the SCATS cone crusher (13), prior to passing once again into the SAG mill (4) for further grinding. The slurry that is fine enough passes through the trommel to a sump (6) and then to a primary hydrocyclone (7). This hydrocyclone classifies the ground rock particles according to size – using centrifugal and gravitational forces to split the fine particles from the coarse particles. The fine particles are pumped via a sump (8) to a secondary hydrocyclone (9), and the larger particles return to the SAG mill (4) for further grinding. The secondary hydrocyclone (9) further classifies the slurry, with the coarse particles being directed to the ball mill (14) and fine particles reporting to the trash screen (10). The ball mill is very similar to the SAG mill, except it has a larger proportion of steel balls to assist in the grinding process. Following grinding in the ball mill, the material is returned via the sump (8) to the secondary hydrocyclone (9) for resizing. The trash screen (10) removes wood from the old workings that may have found its way into the processing circuit. The slurry that remains after this process has a very fine particle size. Typically, 80% of the ore particles are less than 70 microns in size (about the same consistency as fine beach sand). Such a fine particle size is required for gold liberation – the size required for the cyanide to be able to 'see' the gold in the leaching process. The remaining slurry passes through a pre-leach thickener (11), to remove some of the water. The recovered water is reused in the grinding circuit while the thickened slurry moves into the leaching circuit. The slurry (1) of ground ore and lime moves into a series of six leach tanks (2) where a sodium cyanide solution is added. The tanks provide sufficient retention time to allow the gold and silver to be dissolved by the cyanide solution. Oxygen is added to assist in this process. The slurry then moves through a series of carbon adsorption tanks (3). While the leaching process continues in these tanks, the primary objective is to remove the gold and silver from the solution. To achieve this, carbon is fed through the tanks (4) and the gold and silver adsorbs (attaches) to the carbon granules. Carbon is heated to 600 degrees C and fed into the circuit in the opposite direction to the slurry flow, moving from the last adsorption tank to the first. This is because the gold and silver move towards the carbon via a diffusive process. It is necessary to have 'fresh' carbon at the end of the chain, to scalp the gold and silver that has not been removed in the previous tanks. By the time the slurry reaches the final adsorption tank, most of the precious metals have been removed. The barren slurry, now known as tailings, is pumped to the tailings storage facility (5). In contrast, by the time the carbon reaches the first adsorption tank it has recovered most of the gold and silver from solution. This 'loaded' carbon is then pumped to the elution circuit (6) where the gold and silver is washed off with superheated water. The washed solution, called pregnant eluate, is passed to the electrowinning circuit (7). The remaining barren carbon is reactivated by acid washing and kilning and returned to the adsorption tanks (8). The pregnant eluate (1) is passed through a series of electrowinning cells (2), containing cathodes in the form of stainless steel plates. The gold and silver migrates and attaches itself to the stainless steel cathodes. The cathodes are then rinsed, yielding a muddy sludge, and the cathodes are reused.The muddy sludge is dried (3), and the powder that remains is mixed with fluxes (4) and put into the furnace (5). The furnace attains a temperature of 1200 degrees C and after several hours the molten material is poured into a cascade of moulds (6) to produce doré bullion bars. The fluxes form a slag of impurities which is removed, leaving a bar which is a 99% pure melt of gold and silver. Each bar of doré bullion contains around 90% silver and 10% gold, and weighs approximately 20 kg. The bullion is sent to the Western Australian Mint in Perth, where it is further refined to separate the gold from the silver. After refining, the gold and silver is credited to the mint account for Newmont Waihi Gold.
![]()
![]()
![]()
![]()
Newmont Home
Operations
Australia & New Zealand
Waihi Gold, New Zealand
Mining
Processing Plant
![]()



Grinding and Sizing
![]()

![]()


Leaching and Adsorption
Precious Metals Recovery
![]()

Well, I certainly don't know very much about this stuff but I think the FGD operation does not involve a slurry solution. As I read it, the slurry solution is made up of material that has been ground in a mill type operation, FGD does not have a mill and is not using that process. I think they're simply crushing ore to about a 1" diameter, stacking it, running solution over it, once the solution has passed over the ore, the resulting liquid is piped to the precessing facility, and once processed (whatever that means) the carbon screen are sent to Johnson Matthey for refining and voula... GOLD!!!
Please correct if this is incorrect!
rd
Riverdawg has it down pretty good. There is no milling operation since that is used for high grade ore (so no slurry). After the carbons in the tank(s) (in plant) are full, they valve off one tank and continue to run solution into other carbon tanks and then reactivate the carbon for re-use (bascially activated charcoal mixed with resin beads that keeps everything floating to expose maximum surface area of carbon to the gold solution, the adsorption process). They also add cement to crushed ore as it goes onto pad via conveyer to keep material in an aggregate form for most efficient solution flow (They call it agglomeration - imagine popcorn balls made with molasses or caramel). Since cement contains lime it also keeps the pH of the cyanide solution high (10.5 or better) so that they don't get sodium cyanide gas forming (not good).
Since recent laws require very limited mercury emissions (something like 2 lbs/year max - a by product of smelting operations), and FGOC does not yet have in place scrubbers that meet these reqmts., therefore those operations are being temporarily subcontracted. I'm guessing it will be 6 months or more before they can do it all. So they won't actually be pouring gold for a while, but will be nevertheless "producing" gold. This also requires some more permit(s). (Enough with the delays already).
They will send off gold-laden carbons to another local gold production operation who will strip them and pour dore bars (around 94% purity) to send to Johnson Matthey for final refining (Salt Lake City).
Maybe 2009 will finally be our year.