Skip to content
Sign in

Post

Probe Mines

The post this replies to is no longer available.

Prez3.7 rating from 178 members5K ptsRate

date 10





...the program will begin on the western side of the property with the first hole testing a geophysical anomaly associated with the mafic intrusive identified in outcrop and move east from there. It is expected the drilling will take two to three weeks to complete, at which point an update will be provided to shareholders....



Noront takes 2 drills to drill 9+2 in progress in 50days (7weeks)with the depth of 600 meters.

around 9 days for a holes..from the news last week from PRB ,indication for the first hole is 2-3 weeks.

I still doubt that we can get the assays result of Victory Project as mentioned in news..let have the finger crossed...

BH

Join the conversation about Probe Mines.

Reply