i thought it odd that probe drilled the chrome deposit first as it was apparent they would hit a deposit based on the trend line. why use precious drill resources to find what you are fairly sure is there and not well valued yet by the market? now we sit in a holding pattern in the prime drilling period. it seems to me that there are some kind of behind the scenes negotiations going on here and that explains probe's lack of action. i have held probe from the top to the bottom and back up to this level. i welcome any buyout activity that would move our sp up significantly. my opinion is that noront will buy us out for a 1 to 1 share swap and this will happen before noront goes up due to more significant discoveries. probe has a lot of things going for us but nickel is the key. we need to be drilling to hit nickel.

Join the conversation about Probe Mines.

Reply

Replies

  1. I agree with you that drilling for chrome will do nothing for our SP. Something is definitely going on behind the scenes. I have been told that we have drilled into a fault and that the results are interesting. I was also told to hold onto my shares as this is not the time to sell because we are expecting assay results. All I can say is that I hope the results are worth the wait.

    rosehill

    1. Rosehill.

      The last PR on July 27 stated they had drilled 9 holes (first phase) on the Probe/Noront JV ground and visuals demonstrated chromite ("The chromite horizon has been intersected in four drill holes, representing a strike length of 100m, to a vertical depth of 186m, and is open in all directions".)

      Do you know what the continued drilling plan was/is? You stated they drilled into a fault. Is this in the same area or is it a further step out?

      We are anxiously awaiting the assays (" Sampling of the core has been completed and the samples are currently with Activation Labs in Thunder Bay where they will be analysed for associated elements. Results are expected in August and will be released as soon as they are available".)

      Your input, opinion and knowledge is much appreciated.

      Regards.

      B.

    2. Probe originally planned to drill 8 holes (4 drills for chrome and 4 drills for Ni/Cu) for a total of 2,100 metres. Actually 9 holes were drilled for a total of 2,249 metres. By the time that the NR was out, I believe drilling at 9th hole was not finished by July 27th. Dave planned to back and finish it. There might be something else that was not reported in the previous NR. Along with assay results, I'd like to hear a brief of the Phase II drilling plan.

      1. yes right you are - actually did a bit more drilling than planned in the original NR which said 2100 meters. But it does sound as tho more drilling may be on tap this summer and that will be up to NOT/PRB technical comm. to decide where and when etc.

        As the operator of the Probe Mines-Noront Resources joint venture, Probe is currently evaluating results and will provide recommendations for further work to the joint venture technical committee. The nature and scope of the second phase of the summer drilling program will be announced after the technical committee has made its decision.

        I suspect we will see the chromite assays here very soon, and that wont hurt PRB.'s SP.