Look at the volume today
PDAC went well me thinks
Join the conversation about Probe Mines.
ReplyYou’re reading spidermonkey’s reply in this thread.Jump to it
PDAC went well me thinks
Join the conversation about Probe Mines.
ReplyThe volume today should be great for the share price. Since Feb 12th when the stock drove up from $3 to $3.35, we have been range bound, with a top end of the range of $3.35 as you can see by this chart: http://finance.yahoo.com/echarts?s=PRB.V+Interactive#symbol=prb.v;range=20140212,20140305;compare=;indicator=volume;charttype=area;crosshair=on;ohlcvalues=0;logscale=off;source=;
We are not even at 3pm today and we have already traded 1.5% of the outstanding shares. I assume, much of the 1 million shares is a fund divesting a portion/all of their holdings which it probably started to do over the past month, but found willing buyers today. Funds are pretty clever at not tanking a share price, but instead as seen above we were range bound as they executed their sell. I assume that once we eat through this fund's PRB shares, we will be off to the races again.
As I had previously mentioend, I believe there was an institution selling a large stake at or slightly below $3.35. I believe the institution must be finished its selling and there are now clear skys ahead. Imagine where this stock could now move if we received some positive lake drilling.
Hold on to your shares boys and girls. Someone wants them and there aren't enough available. Don't give in at $4, hold out for at least $6 - $7!
SpiderM
$4: Only 4/3.5 = 1.14 = 14% premium? Nah.
$6-7: A bit better, but no much. Take $7, this is only 7/3.5 = 2 = 100% premium, but this would assume a resource of a pit-constrained (there is more lower grade than 1+gpt outside the pit-constrained model, but this is not counted for the 4.3Moz most of which (85%) is indicated resource. If a lower cut-off was used then the resource would be 6.37 Moz Au (50% more than 4.3Moz)...Ref. PRB website.
Case Studies:
Reference Case, Iamgold/Cote Lake: Grade for Cote Lake is 0.82% for 6.8Moz resource, 87% inferred and only 13% indicated. For this IAG paid $608M in 2012. Using the reference case above as a yardstick (mine, you may have yours, but I find this general rule useful, at least it would give a rough estimate...the kind of thing we are doing).
- 4.3 Moz: $608M x 4.3/6.8 =$384M/75Ms = $5.12/s, ignoring the HGZ.
- 6.37 Moz: about the same as Cote Lake, $600m/75M = $8/s, still ignoring the HGZ.
- 10 Moz: taking into account some of the HGZ, $608M/6.8Moz x10Moz = $894M/75M =$12/s. (It would appear that the HGZ could bring the resource up in the 10+ Moz level, based on the high grade results PRB keeps on pulling out of the holes heading to the other side of the lake).
- 12 MozAu for Borden Gold: No need for a calculator for this.
Bottomline: wait for 10+
My take only. Rebuttal, concurrence?
goldhunter
Replying to @goldhunter11
Thanks Goldhunter.
Superb math. Even I, a slow learner, can understand your analysis.
The Big Guys want this stock now, and will want tons more when Borden Lake proves up.
Hold this one for your grandchildren.
It's going tro be a glorious ride.
Jacki