I've been reviewing the press releases on the SAS website to track the history of the Clavos property. In the NI43-101 technical report that was released in October of 2006 there were a number of recommendations for further drilling. They include surface drilling on Blocks A and B, with 5 holes on Block A( 1000 m) and 18 holes on Block B(4,000 m). I wanted to check if SAS had carried out those recommendations prior to the closure of the mining operation in May 2007. I can't find any record of that drilling program being carried out so it's possible that Sage will just carry on with it. What I did find on the SAS website is a company that carried out a 20 to 1 share consolidation in 2006, raised a lot of money, had numerous personnel changes and did a lot of wheeling and dealing. They advanced a number of projects to the mining stage and then had to book impairment losses because some of those operations were not economical to mine. Remember that gold didn't reach $ 700 until later in 2007, so the mining economics have improved considerably since the Clavos project was shut down. It's still green across the board for Sage and the Clavos project.

Join the conversation about Sage Gold Inc.

Reply

Replies

  1. Would like to hear more about SGX plans to advance this property now that it's officially a done deal. Drill program? Should be a priority given the potential of Clavos to move SGX from explorer to producer in the very near-term... Shouldn't it?

    red911

    1. Yes it should be a priority. They have to review the geological model and well locations proposed in the technical resource report produced in 2006, then put together their own program as soon as possible. They've indicated that they will drill the surface program first and then worry about de-watering the underground workings. I'm hoping this area has all year access so they can start drilling as soon as a rig can be lined up. I haven't checked to see if they will be present at the PDAC but announcing a drilling program at Clavos the week before the meeting would be a good move.