Skip to content
Sign in

Post

St. Elias Mines

Treasurer3.4 rating from 19 members420 ptsRate

Clarification

For those who misread the information that was passed along from Primed24. There are two types of drilling as a part of the 10,000m Phase 1 Program - shallow and deep. The shallow rigs have been on site for months and working. The deep drill rigs which will be performed by Bradley Bros or someone similar are the drills that they are talking about. The deep drills are to target the resource grades at the bottom (if there is one) of the anomaly.

Assuming this information is true (and not a surprise), a resource estimate would be many months away and certainly not available for the upcoming AGM.

Just being realistic here - don't quit your day job. Remember Fall 2012.

Rawkstar

Join the conversation about St. Elias Mines.

Reply

Replies

  1. Straight from the August 17th news release:

    "The Company has engaged the Peruvian subsidiary of Energold Drilling Corp. (TSX-EGD) to conduct the initial portion of the drilling program to test the near-surface targets. An additional diamond drill rig, with a deeper drill capacity, is slated to commence drilling in October, 2011 to test the deeper-seated targets."

    This would be what Primed is talking about.