Road
Rumor has it the camp on the galore road before km 48 will stay open and road building will be done all winter. Does this mean the construction of the Shaft road will commence?
Rumor has it the camp on the galore road before km 48 will stay open and road building will be done all winter. Does this mean the construction of the Shaft road will commence?
Wonder why CN IS DOING FLY OVERS and assessments on the old Dease lake extension railway bed which terminates not far from Shaft.
They closed the camp, a drill was sent back to drill.. Something changed last minute on Friday (right before the run up). The drill was called back.No drilling now. Figure that out.
I hear one drill on the way into Shaft. Where are they drilling? lol
I hear Galore drilling was scheduled to shut down Aug 31 as well but in recent days that has been changed to Oct 31. Wonder why it was to shut down Aug 31?