Replied in thread
Re: metal price
Note the NPV calculation used was 5% Our PFS NPV at 5% was $4.79 Billion Based on that NPV which used much lower metals pricing, a much lower grade Resource Estimate with a lower mine throughput rate, our share price valuation is $3.00....not to mention the effect of recent…
