Replied in thread
Re: Clifffs appeals
“The east-west route makes sense if you don’t have huge volumes of material, but it’s a much longer route requiring 282 kilometres of new construction and a total distance of 526 kilometres to get down to Savant Lake – 280 kilometres away from where we’d be if we ended up at Cavell,” said Pavlich. The east-west route via Pickle Lake to the CN Rail line 280 kilometres west of the Cavell siding was rejected both because of the increased distance and the fact that much of the route – from Pickle Lake onwards – is a paved highway that Cliffs would have to share with existing vehicular traffic. “It wouldn’t allow us to operate over the road tractors hauling two trailers with 35 tonnes of…
