Replied in thread
Re: ONE WEEK?
assays were sent to the lab on july 22 Drill hole McF-07-75 was set up on line 8+25 NE and the initial dip was -64 degrees for a total length of 192 meters. The hole was designed to overcut historic 2004 hole McF-04-41 (6.49% Cu and 3.45% Zn o over 8 meters) and infill an area…