Replied in thread
Re: Las Bambas Project
There are two ways to look at Schaft Creek: 1. A mine with 7.1B lbs of copper (M+I) and operating costs of $1.15 / lb. 2. A mine with 14B lbs of copper equivalent (M+I) and operating costs of $2.09 / lb. If you choose to look at the project using Option 2 then you need to use…
