There is a no drill holes for a distance of 278 metres between DDH 415 and DDH 409. Today Elmer mentioned the inferred resources in the Main zone by drilling 10 more drill holes.
Replied in thread
There is a no drill holes for a distance of 278 metres between DDH 415 and DDH 409. Today Elmer mentioned the inferred resources in the Main zone by drilling 10 more drill holes.
Replied in thread
"Is Liard zone (therefore the Liard shares) part of SC or is completely separate from SC Thanks in advance!" The effective date of the mineral resource estimate is May 23rd, 2012. Mineral resources were estimated for the Liard (also referred to as the Main) zone and the…
Replied in thread
"FWIW, I was distressed yesterday when I read the numbers. we've all keyed on the negative production numbers for so long, it was like we were looking at a different project" Up to 2008 the Main zone was the place to drill, the Paramount zone was not really discovered yet. The…
Replied in thread
Mr. Elmer Stewart, President & CEO said "I am extremely proud of the work put into this Feasibility Study by the Copper Fox team and its capable consultants. Like all large scale projects located in alpine type terrain, this project did come with its own unique technical…
Replied in thread
Capex comparo PFS 2008 - Initial Capex $2.95 Billion - Total Capex $3.75 Billion BFS 2012 - Initial Capex $3.25 Billion - Total Capex $4.496 Billion
Replied in thread
Operating Costs LOM site unit operating cash costs, net of capitalized pre-stripping and other predevelopment costs, are$13.33per tonne-milled, as summarized in the table below: LOM Operating Costs Area LOM CDN $/tonne milled Mining 6.56 Processing 4.87 Tailings Facility 0.22…