Replied in thread
Re: Conference Call: Teck
I believe Elmer gave away the plan for phase ll of the drilling program during the conference call.
Replied in thread
I believe Elmer gave away the plan for phase ll of the drilling program during the conference call.
Replied in thread
In the 1960s & 70s Hecla mining drilled the Paramount zone. In the 1980s Teck drilled the Paramount zone. In 2010 Elmer drills Schaft Creek for the first time and discovers the depth of the Paramount zone. In 2012 no drilling in the Paramount & Main/Liard zones because of…
http://www.psmag.com/environment/the-new-bronze-age-entering-the-era-of-tough-ore-60868/ Brand-new copper mines, both open pits and underground, are also proliferating, in places that not long ago would have been unthinkable—too remote, too politically unstable. Even a partial…
Replied in thread
"From what I can read the Feasibility doesn't recommend 10,000 meters of drilling in Phase 1 or in Phase 1 & 2 combined. The presentation is emphasizing moving the waste into measured. Elmer said something about how that would be done as part of the work Teck was about to do.…
Replied in thread
"The Presentation suggests: -Undertake a diamond drilling program to determine the extent to which the 171.16 million tonnes of Inferred Resource within the pit shell can be upgraded to a Measured or Indicated Resource. -Drill east of current Resource Block Model to test area…
Replied in thread
Prospekt Drilling east of the Paramount zone is Elmer's 2013 drill plan shown in the CUU presentation Pg 16.
Reply in Copper Fox Metals Inc.
"As a side note, I just noticed that our presentation says "drill east of current Resource Model to test area treated as waste in Feasibility Study." This sounds like we have undrilled areas included in our pit shell. Is this the same as the 171M tonnes of Inferred resource? O...