Replied in thread
Re: Acceptable Uncertainties
That's where you're wrong. Historical drilling in T-2 comes back with a weighted average of about 2g/t. T-1 comes in just over 1g/t so far and all drilling basically above the 300m level. Tilsley believes this deposit will have an average grade over 3g/t, however I think most of…
