Replied in thread
Re: Golden Minerals Reports Significant Operational Improvements at Velardena
I think the machinery requires a cut of at least 1 meter in width. A lot of our veins are only 1/4 to 1/2 meter wide so if the cut is centered on the mineralization, the high grade ore gets mixed with low grade rock beside it and its value per tonne is diluted. What GM appears…