TD strong buy
thanks to a poster on stock house for pointing it out, i checked my td account and sure enough.. they have 1 analists covering it with a strong buy.. 7 cover hbm with the lower "buy" rating
thanks to a poster on stock house for pointing it out, i checked my td account and sure enough.. they have 1 analists covering it with a strong buy.. 7 cover hbm with the lower "buy" rating
Replied in thread
well looks like 2.55 was the total.. ohwell. market didnt like it, ut this thing will still be mined.. anohter chance for cheap shares as traders and small hands hoping for a windfal leave.. but now instituional investors who needed a 43-101 before they could move in can now do…
apparently i didnt read the whole release.. that is hbm's portion as per jv/option agreements.. so its actually a total of 3.64 million tons.. bodrocker on SH brought that to our attention.. so 3.6 Million at 5% cu-eq, vms portion would be worth 500million roughly.. not to shabby
sometimes it feels like im talking to myself.. so todays 43-101 was buried in hbms release, after hours.. my calculations give it approx 5% cu-eq for the 2.55million indicated.. that values the 30% portion at almost 350million.. cap ex will be minimal, start up will be minimal..…
Reed Copper Project ----------------------------------------------------------------------- ----- Category Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) ---------------------------------------------------------------------------- Indicated 2,550,000 0.64 7.86 4.52 0.91 Inferred 170,000…
if you take the 288$ per ton(80% recovery, 4.5$ copper, 4%cu-eq) and you use the highend operating cost of chisel north (100$) you come out with 188$ per ton... multiply by 4 million tons.. (30% of that) is 225.6 million.. just to think about lol