Replied in thread
Re: Some thoughts and calculations
I think that the bulk sampling at Ascot Zone will tell the story there...not the drill. The drill will be used to define the area, not determine grade. Ascot = open pit, lower grade, high tonnage Timmis = ramp/shaft, higher grade, high tonnage My opinion only. Ascot needs to be…
