Does Schaft size matter,,,
I think CUU will be using that First Right Of Offer as soon as Teck has the proof in hand. The majors won't ignore the size, the location, the partner/opertaor, the EAA and th eport an dteh power. http://www.vette350.com/2013/07/teck-resource-cuu-to-drill-east-side-of.html
