ecce
VEEP
VEEP
Replied in thread
Dont forget this: Production optimization levels will be determined once additional storage facilities and oil transportation arrangements are in place. One steo at the time and we will get there. ecce
Replied in thread
As of 11:29 Bid 207,000 at 0.21 Ask 97,500 at 0.21 And it's building So let's go......UP ecce
Replied in thread
MEO part of it is 260bpd. But they also mentioned this, which we dont know the amount: In excess of 250 barrels of light gravity oil flowed to surface during an eight-hour production test on the Morgan Highpoint # 3 "Discovery"; Well with an associated high gas/oil ratio. These…
Replied in thread
Definitely not on my part even though I was not expecting flow like HW for the moment. Expectation was too high But, that's a beginning. Now, lets have more ecce
Replied in thread
That's deceiving. It fits my first SP projection on the lower level. But other well are coming I hope + Alberta. At least, figure starts to be shown ecce