HPQ website
the website needs to be updated,the technology window show PurVap,FSR and NSIR,we moved away from the NSiR some time ago,and have added battery anode material and hydrogen ,this should be on the website.
the website needs to be updated,the technology window show PurVap,FSR and NSIR,we moved away from the NSiR some time ago,and have added battery anode material and hydrogen ,this should be on the website.
am i reading it correctly,seems like HPSI plan to go direct to production from lab scale,without building a working pilot plant,is this correct and if so what conditions make it possible to do so.
Replied in thread
i'm not 100% sure,but I think the can/scrap would be used as feed stock to be turned into a alum/silicon material which would be put into the reactor to produce the hydrogen.
is the pilot plant being built to produce the aluminum/silicon or is it a pilot plant hydrolysis reactor,to produce the hydrogen? or both?
Nice bit of info, but not real exciting, I was expecting that 'profound announcment referred to in the previous video ,so this was a little disapointing,but still small steps in the right direction, As to the Evonik LOI,in the NR from july there is no mention or hint of a off…
https://irp.cdn-website.com/b4d0784e/files/uploaded/Quantum_BIopharma_Complaint.pdf