Replied in thread
Re: Hinge Zones
From the last new release (Feb 19), SGR talks about exploring another area for potential. As Below. The Hinge #4 zone has now been drill tested between section 0 east and 800 east (feet), (250 m) and to depths of over 1,200 feet (400 m) demonstrating excellent continuity in both…