Replied in thread
Re: News out.
Key changes. "mining approximately 1.03 billion tonnes of waste resulting in a 1:1 strip ratio compared to the strip ratio of 2.16:1 set out in the 2013 feasibility study" "The LOM operating cost are estimated to be US$8.66/t processed compared to US$13.25/t processed in the…
