Replied in thread
Re: Resource Estimate
1M tonnes x $8,500/tonne = $8.5B (or $12B, including the inferred) would be the worth of the deposit in the ground (in-situ). As indicated this deposit would have to be brought up above ground (mined), milled and refined to get a product that can be sold for, say $8,500/tonne. -…