packsackman
Treasurer
Most active in
Noront Resources
Tweed, Canada Joined January 2009 2.09 from 185 ratings
Treasurer
Replied in thread
Maybe they have just drilled granodiorite and no massive sulphides on the carrot
Replied in thread
A very good average for drilling is 60 metres per shift or 120 metres in 24 hours, However this changes remarkable once you pass the 400 metre level where pulling the core tub between runs takes a lot longer. Averages drop to 20-40 metres per shift. I think if you get 40 metres…
Replied in thread
Hugely serious, could force the shut down of Agoracom
Replied in thread
I would think that 2000 metres may take a minimum of 2 weeks, after you pass 400 metres drilling slows down a lot
Replied in thread
"We could be looking at a new King of the Ring." I think we have the new "Chrome Kings"