Replied in thread
-Many that I forgot-This is the problem as the leader admits. In fact nobody knows about any and this will be corrected I believe shortly. What do you know that we dont know?
Replied in thread
2.6 M crossed Peter Smith has 2.4 M His wife has .2 M 2.6 total We should know from insider trading list tomorrow or Monday at latest
Replied in thread
Down hole and not true width The drill programs of 2011 and 2012 were designed to fully test the iron mineralization to vertical depths of 350 meters. Two drill holes (LS-12-27 and LS-12-29) were drilled to vertical depths of 600 meters to 650 meters and intersected equally as…