Replied in thread
Re: Expectations for Q2 report tomorrow
I think you are right on the $5 million. They should have been $20 million under as I believe $15 million was contingency money
Prez
Favorite NHL Team: Calgary Flames
Replied in thread
I think you are right on the $5 million. They should have been $20 million under as I believe $15 million was contingency money
Replied in thread
I think you are right for MRC I think you are high by maybe 300-400 bbl/d on GD. I think Algar may get 3 truck loads by the end of June, whatever that equates to in barrels, certainly not 1500 bbl/d average Conventional and NG about the same, but not a big factor Hedging and…
Replied in thread
Glindy They have to pay all interest regardless of whether it is expensed or capitilized. Spidey
Replied in thread
Nope, if you read closely he says...... With anticipated production from Pod One averaging approximately 8,500 bbl/d, we envisage total 2010 bitumen production at approximately 10,185 bbl/d of bitumen with a 2010 exit rate ranging between 16,000 and 17,000 bbl/d of bitumen.
Pretty Much in line with expectations. Nice to see they are planning for an expansion late 2011,early 2012. This gives them time to strengthen the balance sheet. Production finally averaged over 6500 bbl/d in a quarter and should be 7000 bbl/d 2nd quarter with the ESP's. I don't…
Replied in thread
The budget myth...is the budget $360 or $375 M. My thought was the budget was 360 with a 15 M contingency. Therefore if they are under budget, not including sunk or interest costs, it should be under $360. I think costs should come in at about$345 M, simply because of cost…