Replied in thread
Re: Cost's below $825
..just thinking out loud , if San does mine 80 % from the hinge and 007 for the foreseeable future then with 20 stopes averaging 80 to 100 tns in a 24 hr x 1800 tn of high grade. We could see 500 to 700 oz /day from these stopes. PS" 11.4 cu ft = 1 tn x the grade ( grams ) at…
