Skip to content
Sign in

Anfield Energy Inc.

$AEC · TSX-V

Unclaimed AGORACOM Hub

Anfield Energy Inc.

  • CanadaTSXV:AEC

Anfield Energy Inc. is a uranium and vanadium development and near-term production company whose assets are all in the United States, principally Utah and Colorado, with additional holdings in Arizona and New Mexico.

Company facts

Exchange
TSX-V
Symbol
AEC
Industry
Metals & Minerals

Company overview

TSX-V: AEC

Anfield Energy Inc.

Uranium and vanadium developer with U.S. mill and mines

One of 3 licensed U.S. uranium millsFirst underground blast in 40 yearsVelvet-Wood restart targeted 2026

Anfield Energy is a uranium and vanadium developer with assets in Utah, Colorado, Arizona and New Mexico. Its Shootaring Canyon Mill is one of three licensed, permitted and constructed conventional U.S. mills. The company is pre-production and is advancing mine permitting and rehabilitation at Velvet-Wood.

C$3.0M
Cash
C$100.2M
Total assets
C$22.8M
9m net loss
19.9M
Shares out

TSX-V: AEC | Nasdaq: AEC | Frankfurt: 0AD

The company

U.S. uranium and vanadium developer

Operations and stage

  • Shootaring Canyon Mill: licensed, constructed, on care-and-maintenance, hub for mines.
  • Velvet-Wood: most advanced mine, surface construction done, underground rehab underway.
  • Pre-production: revenue from engineering subsidiary, net losses, work on permits.

Anfield holds uranium and vanadium assets across Utah, Colorado, Arizona and New Mexico. It aims to feed the Shootaring mill from several mines under a hub-and-spoke model.

The projects

Mines and mill across U.S.

Four key projects

Utah

Shootaring Canyon Mill

Licensed, constructed conventional uranium mill; draft renewed licence caps output at 3M lb/yr; refurbishment plans target 1,000 tpd and a vanadium circuit.

Utah

Velvet-Wood

Most advanced mine; Phase One surface construction completed June 2026; first underground blast in 40 years August 2026; restart targeted end-2026.

Colorado

Slick Rock Complex

Conventional uranium and vanadium project in Uravan Mineral Belt; 6,473 acres; PEA estimates 0.8M lb indicated and 9.9M lb inferred eU3O8.

Colorado

West Slope / Paradox Complex

Group of uranium and vanadium mines in Montrose and San Miguel Counties; historical production 1.3M lb U and 6.6M lb V; would supply Shootaring.

The numbers

Key financials at Sep 30, 2026

Financial snapshot

C$3.0M

Cash at September 30, 2026.

C$100.2M

Total assets at September 30, 2026.

C$2.3M

Revenue from engineering business, nine months ended September 30, 2026.

C$22.8M

Net loss for nine months ended September 30, 2026.

Nine months ended September 30, 2026, per company filings.

The last 12 months

Key developments

Recent milestones

  1. Oct 2026
    • Draft mill licence and permit received. Utah's Division of Waste Management and Radiation Control provided draft renewed radioactive materials licence and groundwater discharge permit for Shootaring Canyon Mill.
  2. Aug 2026

    • First underground blast in 40 years. Anfield completed first underground blast at Velvet-Wood after receiving blast permit in June 2026.
  3. Jul 2026

    • US$6.9M equity offering closed. Closed underwritten public offering of 1,715,000 common shares at US$4.00 for US$6.9M, including participation from UEC Energy Corp.
  4. Jun 2026

    • Velvet-Wood Phase One surface construction complete. Completed new portal, gates, ventilation and rehabilitation of nearly 1,500 feet of decline.
  5. May 2026

    • B.R.S. Inc. acquisition closed. Acquired engineering firm B.R.S. Inc. for total cash consideration of US$5,000,000 payable in instalments.
What's next

Company's stated plans

Upcoming milestones

  1. End 2026

    • Velvet-Wood production restart. The company says it remains on track to resume production at Velvet-Wood by the end of 2026.Planned
  2. Q2 2027

    • Shootaring renewed licence and refurbishment start. The company targets receipt of the renewed Shootaring licence and start of major refurbishment in the second quarter of 2027.Planned
  3. Late 2026 / early 2027

    • 45-day public comment period. The company anticipates a 45-day public comment period on the draft licence and draft permit beginning either in late 2026 or early 2027.Planned
Things to know

Important considerations

  • BRS acquisition a related-party deal; US$5M cash, C$4.7M goodwill.
  • Loans payable C$13.9M; credit facility consented to BRS for shares/warrants.
  • Accumulated deficit C$124.4M at September 30, 2026.
  • Working capital C$2.3M, down from C$4.0M at end-2025.
Leadership

Who runs the company

  • Corey Dias, Chief Executive Officer, Co-Founder and Director
  • Ken Mushinski, Chairman

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.