Skip to content
Sign in

Post

Argonaut Gold Inc.

You’re reading drandres’s reply in this thread.Jump to it

Prez3.5 rating from 114 members7K ptsRate

What is the deal with our book value?

Is there something that I should know about book values? We are listed as having a book value of $6.84 while trading at a magnificient $1.40. Is there no relationship between the two? Sell the sucker for $6.00 and get me the hell outa here ya'll. Que pasa here? Anyone have any thoughts on this? I never thought that I would wind up underwater after having sold a bunch at $9.00 after Brian made that magnificient (in hindsight) sale.

Doc

Join the conversation about Argonaut Gold Inc.

Reply

Replies

  1. Argonaut Gold

    Argonaut Gold Announces 2014 Revenue of $166.3M,
    $42.5M in Cash Flow from Operations before Changes in Non-Cash
    Operating Working Capital and Other Items

    March 16, 2015

    Toronto, Ontario - (March 16, 2015) Argonaut Gold Inc. (TSX: AR) (the “Company”, “Argonaut Gold” or “Argonaut”) is pleased to announce its financial and operating results for the fourth quarter and full year ended December 31, 2014.All dollar amounts are expressed in United States dollars unless otherwise specified.

    3 months ended
    December 31
    Change
    12 months ended
    December 31
    Change
    2014
    2013
    2014
    2013
    Financial Data (000s except for earnings (loss) per share)
    Revenue
    $48,959
    $34,604
    ↑41%
    $166,266
    $165,061
    ↑1%
    Gross profit
    $2,908
    $8,553
    ↓66%
    $22,651
    $59,065
    ↓62%
    Net income (loss)
    ($7,205)
    ($20,058)
    ↑64%
    ($4,190)
    $4,628
    ↓191%
    Earnings (loss) per share - basic
    ($0.05)
    ($0.13)
    ↑62%
    ($0.03)
    $0.03
    ↓200%
    Cash flow from operating activities before changes in non-cash operating working capital and other items
    $7,329
    $9,315
    ↓21%
    $42,514
    $61,734
    ↓31%
    Cash and cash equivalents
    $51,446
    $81,076
    ↓37%
    Gold Production and Cost Data
    GEOs loaded to the pads1
    62,823
    51,549
    ↑22%
    241,656
    183,929
    ↑31%
    GEOs projected recoverable 1,2
    38,093
    28,542
    ↑33%
    140,563
    105,481
    ↑33%
    GEOs produced1
    44,312
    28,896
    ↑53%
    136,706
    121,243
    ↑13%
    GEOs sold1
    41,172
    27,823
    ↑48%
    132,977
    118,877
    ↑ 12%
    Average realized sales price
    $1,196
    $1,248
    ↓4%
    $1,256
    $1,392
    ↓10%
    Cash cost per gold ounce sold3
    $801
    $654
    ↑22%
    $771
    $644
    ↑20%
    1 Gold equivalent ounces (“GEO” or “GEOs”) are based on 55:1 conversion of silver to gold.
    2 Recoverable ounces – El Castillo expected recovery rates: ROM oxide 50%, crushed oxide 70%, ROM transition 40%, crushed transition 60%, crushed sulphides argillic 30% and crushed sulphides silicic 17%; La Colorada expected recovery rates: gold 60% and silver 30%.
    3 Refer to section Non-IFRS Measures.
    1. Argonaut Gold

      Argonaut Gold News

      Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

      Strong Quarterly Production Shows Increase of 40% year over year, on Track for Full Year Guidance

      Toronto, Ontario – (April 15, 2015) Argonaut Gold Inc. (“Argonaut”, “Argonaut Gold” or the “Company”; TSX: AR) announced today that it had production of 43,255 gold equivalent ounces (“GEO” or “GEOs”) during the first quarter ended March 31, 2015. This included 24,845 GEOs at its 100% owned El Castillo Mine (“El Castillo”) located in the State of Durango, Mexico and 18,410 GEOs at its 100% owned La Colorada Mine (“La Colorada”) located near Hermosillo, Mexico.

      1st Quarter
      Change
      2015
      2014
      Total Gold Equivalent Ounce Production:
      GEOs loaded to the pads1
      54,254
      52,605
      ↑ 3%
      GEOs projected recoverable ounces1,2
      31,634
      29,325
      ↑ 8%
      GEOs produced ounces1
      43,255
      30,963
      ↑40%
      GEOs ounces sold1
      42,418
      30,165
      ↑41%

      1 GEOs are based on conversion ratio of 55:1 for silver to gold ounces and is the referenced ratio throughout this release.
      2 Recoverable ounces – El Castillo expected recovery rates: ROM oxide 50%, crushed oxide 70%, ROM transition 40%, crushed transition 60%, crushed sulphides argillic 30% and crushed sulphides silicic 17%; La Colorada expected recovery rates: gold 60% and silver 30%.

      FIRST QUARTER 2015 HIGHLIGHTS:

      Corporate Highlights

      • Cash balance grows to $64 million.
      • The La Colorada Mine was selected as Mexico’s best company for Corporate Social Responsibility in the small mines category.

      El Castillo

      • Quarterly production of 24,845 GEOs.
      • During the quarter, 30,556 contained gold ounces loaded on the leach pads.
      • Over 74,000 tonnes per day mined and 2.8 million ore tonnes placed on the heap leach pads during the quarter.
      • Advancement of the construction of the valley between pad 8 and 1-7 (90% complete) and 3B East (1/3 complete) pads.

      La Colorada

      • Record quarterly production of 17,169 gold ounces and 68,261 silver ounces, for 18,410 GEOs.
      • During the quarter, 18,208 contained gold ounces and 301,975 contained silver ounces loaded on the leach pads.
      • Average crusher throughput for the quarter of 12,661 tonnes per day.
        • Record throughput of more than 14,800 tonnes per day in March; this included processing nearly a 50/50 blend from the historic heap leach pad 6 and fresh ore from the La Colorada/Gran Central pit.
      • Advanced capital projects:
        • Phase I of pad 6 finished.
        • Pad 9A ground cleared.
        • Installation of phase I of overland conveyor 80% complete.

      Pete Dougherty, Argonaut Gold’s President and CEO, said “Argonaut continued to have strong production in the first quarter of 2015, in which we produced nearly 31% of the full year production guidance. We continue to see the benefits of operating at a higher cyanide concentration in the circuit, by way of improved recoveries.

      The production results in the first quarter exceeded expectations; however, the Company would like to reiterate that production is anticipated to be higher during the first part of 2015 and will taper off during the latter part of the year. Production guidance of 135,000 to 145,000 ounces during 2015 is maintained. We anticipate that costs will trend higher as we continue to use additional cyanide.

      The operating teams achieved tremendous production results at both operations, setting us up well in terms of achieving our full year goals in 2015. These goals are: continuing to focus on our core principles of safe and efficient operations, meeting production goals and targets, controlling costs and advancing and adding value to our portfolio of development projects.”

    2. Earings: All in cost is pretty good stuff even at these rather depressed gold prices.

      Argonaut Gold Announces First Quarter 2015 Revenue of $51.0 M; Cash Balance Builds to $64.0 M

      Argonaut Gold via dissemination.blendermedia.com

      7:32 AM (1 hour ago)

      Argonaut Gold

      Argonaut Gold Announces First Quarter 2015 Revenue of $51.0 M;
      Cash Balance Builds to $64.0 M

      May 5, 2015

      GEO Production Increases by 40% Year over Year

      Toronto, Ontario - (May 5, 2015) Argonaut Gold Inc. (TSX: AR) (the “Company”, “Argonaut Gold” or “Argonaut”) is pleased to announce its financial and operating results for the first quarter ended March 31, 2015. All dollar amounts are expressed in United States dollars unless otherwise specified.

      1st Quarter Change
      2015 2014
      Financial Data (in millions except earnings per share)
      Revenue $51.0 $39.1 ↑30%
      Gross profit $6.8 $8.0 ↓15%
      Net income $1.5 $2.8 ↓46%
      Earnings per share - basic $0.01 $0.02 ↓50%
      Cash flow from operating activities before changes in non-cash operating working capital and other items $16.8 $12.9 ↑30%
      Cash and cash equivalents $64.0 $59.7 ↑ 7%
      Gold Production and Cost Data
      GEOs loaded to the pads1 54,254 52,605 ↑ 3%
      GEOs projected recoverable ounces1,2 31,634 29,325 ↑ 8%
      GEOs produced ounces1 43,255 30,963 ↑ 40%
      GEOs ounces sold1 42,418 30,165 ↑ 41%
      Average realized sales price per gold ounce $1,211 $1,304 ↓7%
      Cash cost per gold ounce sold3 $735 $731 ↑1%
      All-in sustaining cost per gold ounce sold3 $883 $976 ↓10%

      1 Gold equivalent ounces (“GEO” or “GEOs”) are based on a conversion ratio of 55:1 for silver to gold and is the referenced ratio throughout this release.
      2 Recoverable ounces – El Castillo expected recovery rates: ROM oxide 50%, crushed oxide 70%, ROM transition 40%, crushed transition 60%, crushed sulphides argillic 30% and crushed sulphides silicic 17%; La Colorada expected recovery rates: gold 60% and silver 30%.
      3 Refer to section Non-IFRS Measures.

      FIRST QUARTER 2015 FINANCIAL HIGHLIGHTS:

      • Revenue of $51.0 million from sales of 42,418 GEOs at an average price of $1,211 per gold ounce.
      • Net income of $1.5 million, the foreign exchange effects of the weakening Mexican peso impacted income tax expense via an increase in deferred tax expense of $1.2 million.
      • Cash flow from operations before changes in non-cash working capital and other items of $16.8 million.
      • Capital investments of $11.1 million (mineral properties, plant and equipment) during the quarter.

      2015 Company Highlights:

      • Corporate Highlights:
        • Cash balance grows to $64.0 million.
        • The La Colorada mine was selected as Mexico’s best company for Corporate Social Responsibility in the small mines category.
      • Production:
        • Production of 43,255 GEOs, a 40% improvement over the first quarter of 2014.
        • Overall cash cost of $735 per gold ounce sold (refer to Non-IFRS Measures section).
        • All-in sustaining cost of $883 per gold ounce sold (refer to Non-IFRS Measures section).
      • El Castillo
        • Quarterly production of 24,845 GEOs.
        • During the quarter, 30,556 contained gold ounces loaded on the leach pads.
        • Over 74,000 tonnes per day mined and 2.8 million ore tonnes placed on the heap leach pads during the quarter.
        • Advance Capital Projects:
          • West valley pad between pad 8 and pads 1-7 (90% complete)
          • East pad 3B (35% complete).
      • La Colorada
        • Record quarterly production of 17,169 gold ounces and 68,261 silver ounces, for 18,410 GEOs.
        • During the quarter, 18,208 contained gold ounces and 301,975 contained silver ounces loaded on the leach pads.
        • Average crusher throughput for the quarter of 12,661 tonnes per day.
          • Record throughput of more than 14,800 tonnes per day in March; this included processing nearly a 50/50 blend from the historic heap leach pad 6 and fresh ore from the La Colorada/Gran Central pit.
        • Advanced capital projects:
          • Phase I of new pad 6 completed.
          • Pad 9A ground cleared.
          • Installation of phase I of overland conveyor 80% complete.