
Bayfield Ventures
TSXV:BYV
81m @ 5.08 g/t Gold, 28m @ 13.28 g/t Gold, 9m @ 12.88 g/t Gold, 46.6m @ 2.28 g/t Gold plus Bonanza grade Silver (up to 1760 g/t)
Sentiment
No picks yetSign in to say how you feel about this company.

81m @ 5.08 g/t Gold, 28m @ 13.28 g/t Gold, 9m @ 12.88 g/t Gold, 46.6m @ 2.28 g/t Gold plus Bonanza grade Silver (up to 1760 g/t)
Sign in to say how you feel about this company.
Replied in thread
OPEN PIT MINE. Taken from today's NR that a drill rig has been mobilized back onto the Burns Block.
Bayfield Ventures Closes Financing With the MineralFields Group Bayfield Ventures Corp. (TSX VENTURE:BYV) (FRANKFURT:B4N) (the "Company") is pleased to announce that it has closed its non-brokered private placement of $300,000.00 through the sale of 1,000,000 flow-through units…
TO START NEXT WEEK, THINGS MUST BE GOOD.
"Burns" Block location map, Rainy River, NW Ontario http://www.bayfieldventures.com/i/pdf/BYVRainyRiver-Bayfield.pdf
This NR was released simultaneously under Rainy River Resource-RR.V I can only assume then that it was sanctioned by and agreed to by RR.
Friday, March 05, 2010 News Release Rainy River Drill Program Continues on "Burns" Block, NW Ontario Vancouver, BC - Bayfield Ventures Corp. (TSX-V: BYV) (FWB: B4N) (the "Company") reports that a drill rig has been mobilized back onto the Company's 100% owned Burns Block in the…
Vancouver, BC - Bayfield Ventures Corp. (TSX-V: BYV) (FWB: B4N) (the "Company") announces it has received results from a drill program completed by Rainy River Resources Ltd. (TSX-V: RR) on Bayfield's Burns' Block located within Rainy River's main block in the Richardson…
They are the hole in the donut in that prime piece of gold real estate. They are literally sitting in the middle of a GOLD mine. I'm predicting a bright future for them in Rainy River. This story is just getting started.
Enjoy this one.. could very well be a winner... Nice looking core IMHO Drill rig coming back so soon..and starting drill another program Assays back anytime ..
MEETINGS ARE HAPPENING NEXT WEDNESDAY,THURS AND FRIDAY IN TORONTO WITH BROKERS BEFORE THE PDAC, ASSAYS ON HAND. BUY WHILE YOU CAN BEFORE RR TAKES IT.
Rainy River Drill Hole RR10 – 03 was at 839metres as of this morning. Azimuth is 355 degrees. The dip is 64degrees. Drilling will continue till 5 pm this evening.
Last 5 Trades Shares Bought Shares Sold Huston, Donald, Carl -7,000 Huston, Donald, Carl -24,500 Huston, Donald, Carl -5,500 Huston, Donald, Carl 55,000 PETTIT, JIM, GAYDON 28,000
March 3, 2010 - 3:01 AM EST close Friend's Email Receive Copy: yes + scale + '&webmasterId=94743&webmasterId=94743&snap=true&symbol=BYV:CA&chtype=AreaChart&chwid=178&chhig=130&chbdr=dddddd&chfill=ffffff&chfill2=dddddd&chmrg=3&chfrmon=false&chcon=off&chton=some'; } BYV:CA 0.35…
Bayfield Ventures Closes Non Flow-Through Private Placement Bayfield Ventures Corp. (TSX VENTURE:BYV) (FRANKFURT:B4N) (the "Company") announces that it has issued a total of 1,000,000 units pursuant to a private placement announced January 28, 2010. A total of 1,000,000…
Thu Feb 11, 2010 Bayfield Ventures Completes Phase One Drilling in Rainy River, NW Ontario Vancouver, BC - Bayfield Ventures Corp. (TSX-V: BYV) (FWB: B4N) (the "Company") announces that the Company has now completed its phase one 2010 winter drill program on its "Burns" Block…
Bayfield Ventures Corp (BYV:TSXV) - News Alert Bayfield Ventures Announces Financing With the MineralFields Group Bayfield Ventures Corp. (TSX VENTURE:BYV) (FRANKFURT:B4N) (the "Company") announces a non-brokered private placement of $300,000.00 through the sale of 1,000,000…
Rainy River Drill Hole RR10 – 03 was at 603 metres as of this morning. Azimuth is 355 degrees and the dip is 77 degrees.
'This means that some bigger players are now stepping up to the plate. We can also expect to see much more drilling in this area.. This indicates the confidence in this project that MineralFields now has. All in all.. Great news..IMHO
Rainy River Drill Hole RR10 – 03 was at 839metres as of this morning. Azimuth is 355 degrees. The dip is 64degrees. Drilling will continue till 5 pm this evening.
Rainy River Drill Hole RR10 – 03 was at 839metres as of this morning. Azimuth is 355 degrees. The dip is 64degrees. Drilling will continue till 5 pm this evening.