
Bayfield Ventures
TSXV:BYV
81m @ 5.08 g/t Gold, 28m @ 13.28 g/t Gold, 9m @ 12.88 g/t Gold, 46.6m @ 2.28 g/t Gold plus Bonanza grade Silver (up to 1760 g/t)
Sentiment
No picks yetSign in to say how you feel about this company.

81m @ 5.08 g/t Gold, 28m @ 13.28 g/t Gold, 9m @ 12.88 g/t Gold, 46.6m @ 2.28 g/t Gold plus Bonanza grade Silver (up to 1760 g/t)
Sign in to say how you feel about this company.
Replied in thread
Replied in thread
Replied in thread
Replied in thread
Replied in thread
Replied in thread
Replied in thread
Bayfield Announces Non-Brokered Private Placement Bayfield Ventures Corp. (TSX VENTURE:BYV) (FRANKFURT:B4N) (the "Company") announces that it has arranged a non-brokered private placement of up to 1,000,000 units at a price of $0.25 per unit. Each unit consists of one common…
Excellent!! Thank you!
1st hole (RR10-1) was drilled at an angle (dip) of 45 degrees and an azimuth of 355 degrees. It was completed to a depth of 251.3 metres. Hole RR10-1 is designed to confirm gold values received from previous Rainy River Resources (RR) drilling on the Burns Block. A wide Zone of…
I can hardly wait to see the drill results. Hopefully we don't have to wait to long.
Rainy River Drill Hole RR10 – 03 was at 440 metres as of this morning. Azimuth is 355 degrees and the dip is 77 degrees.
Rainy River Drill Hole RR10 – 03 was at 355 metres as of this morning. Azimuth is 355 degrees The dip is 77 degrees. Rock in the last several boxes have the good sericite.
There is a correction issued today and a drilling update.. Rainy River Drill Hole RR10 – 02 was completed to 401 metres. Rainy River Drill Hole RR10 – 03 has just begun and is at 10 metres this morning. Hole RR10 – 03 (not hole RR10 - 2) is planned to be drilled to 700 to 800…
eom
RainyRiver Drill Hole RR10 – 03 was at 499 metres as of this morning. Azimuth is 355 degrees The dip is 77 degrees. Short intervals of honey yellow sericite alteration seen.
You mentioned good sericite today in your post. How special is that for us shareholders of BYV going forward? TIA, and all the best with your investing.
Rainy River Drill Hole RR10 – 03 was reported at 250 metres as of Sunday morning. Azimuth is 355 degrees The dip is 77 degrees.
They had a terrific NR today, which will really benefit BYV in the future.
ful' o' gas: Can you give us your thoughts and expectations on this news that they now plan on drilling this hole to 700 metres? TIA, I always appreciate your posts. NorthWesternOntarioBoy
And only 22 million shares outstanding.
RainyRiver Drill Hole RR10 – 01 ..completed to 251.3 .metres. Rainy River Drill Hole RR10 – 02 is at 150 metres as of this morning and will probably be drilled to 400 metres I wonder what they have seen in the first hole to encourage them to drill the second one deeper..
eom
Bayfield Ventures (TSX-V: BYV) This morning...Rainy River Drill Hole RR10 – 02 at 315 metres . also note.. They are now planning on taking this hole to 700 metres.
Like the sound of that E. TH
Rainy River Drill Hole RR10 – 02 is now at 239 metres as of this morning. Drilling is going nicely.. No problems
Rainy River Intersects 352.84 g/t (10.29 oz/t) Gold Over 6.0 Metres in Newly Expanded Beaver Pond Zone and 436.0 g/t (12.72 oz/t) Over 1.5 Metres in 433 Zone Highlights - Beaver Pond ("BP") drilling intersects 51.0 metres grading 42.5 g/t (1.24 oz/t) gold including 6.0 metres…