Buffalo Potash Corporation
TSXV:BUFF
OTCQB:BLPTF
Buffalo Potash Corporation is a Saskatoon, Saskatchewan-based potash developer advancing its 100%-owned Disley Project, which covers approximately 10,610 hectares about 50 km northwest of Regina.
Company facts
- Exchange
- TSX-V
- Symbol
- BUFF
- Secondary symbol
- BLPTF
- Industry
- Metals & Minerals
- Website
- buffalopotash.ca
Company overview
Buffalo Potash Corporation
Potash developer advancing Disley Project in Saskatchewan.
100% owned Disley Project.IPM designed for 125,000 tpa potash.First production targeted Q1 2027.
Buffalo Potash is advancing its 100%-owned Disley Project in Saskatchewan using patented horizontal line-drive solution mining. The company is building an Initial Production Module for 125,000 tonnes per year of soluble potash, with first production targeted for Q1 2027.
- 109.7M
- Common shares
- 1.67B t
- M&I resource
- C$14.9M
- Private placement
- US$639M
- Initial CAPEX
First potash production targeted Q1 2027.
Saskatchewan-based potash developer using patented technology
Disley Project and Initial Production Module
- 100%-owned Disley Project covers 10,610 hectares 50 km northwest of Regina.
- Patented Horizontal Line-Drive selective solution mining method.
- Building Initial Production Module for 125,000 tonnes per year.
Development-stage company targeting first production from the IPM in Q1 2027. Two larger planned mines, Disley East and Disley West, would follow.
Disley Project and its planned facilities
Disley Project, IPM, and HLD technology
Saskatchewan
Disley Project
100%-owned project 50 km northwest of Regina covering 10,610 hectares. Measured and indicated resource: 1,671.5 Mt at 34.8% KCl; PEA plans 1,125,000 tpa total.
Phase 1
Initial Production Module (IPM)
Designed for 125,000 tonnes per annum of soluble-grade potash. First production targeted Q1 2027. First of three planned solution mining facilities.
Patented
Horizontal Line-Drive (HLD)
Selective solution mining using horizontal wells drilled along a clay seam. Potash dissolved and pumped to surface as brine. US Patent No. 11,073,008.
Expansion
Disley East and Disley West
Two planned mines, each 500,000 tonnes per annum. Full build-out with IPM totals up to 1,125,000 tpa. Feasibility study to run concurrently with IPM construction.
Selected resource and financial metrics
Key figures from company disclosure
All figures as reported by the company.
109.7M
Common shares outstanding as of July 1, 2026.
1.67B t
Measured and indicated resource at Disley: 1,671.5 million metric tonnes at 34.8% KCl (April 27, 2026).
C$14.9M
Gross proceeds from oversubscribed and upsized non-brokered private placement, closed June 29, 2026.
US$639M
Initial CAPEX estimate for Disley Project, including US$128M in contingency (PEA, April 27, 2026).
Data as of 2026; sources: Buffalo Potash website and Newsfile.
Recent milestones at Disley
Milestones toward first production
- Nov 2026
- Fluid communication established. Buffalo Potash connected its second producer well, establishing fluid communication between all three horizontal wells.
Oct 2026
- Phase 3 injection began. The company began Phase 3 brine injection and Phase 4 site development at the IPM, with first production targeted for Q1 2027.
Oct 2026
- Royalty agreement signed. Buffalo Potash entered into a binding letter of intent for a royalty agreement with Altius Royalty.
Oct 2026
- Environmental approval received. The Saskatchewan Ministry of Environment approved construction and operation of the Disley Initial Production Module.
Sep 2026
- Final horizontal well completed. The company completed the third and final horizontal well at the IPM, concluding its drilling program.
Jun 2026
- Private placement closed. Buffalo Potash closed the second and final tranche of an oversubscribed private placement, raising aggregate gross proceeds of C$14.85 million.
Company-stated plans
Upcoming milestones
Q1 2027
- First production targeted. The company targets first production from the Initial Production Module in Q1 2027.Planned
Concurrent with IPM construction
- Feasibility study. A feasibility study for Disley East and Disley West will run concurrently with IPM construction, with completion as the key decision gate for construction.Planned
During IPM development
- Crystallizer test. The company will test its patent-pending Vortex Crystallizer alongside an industry-standard crystallizer during IPM development.Planned
Key cautions
- Production decision not based on a feasibility study of mineral reserves.
- PEA does not constitute a feasibility study or demonstrate economic viability.
- Pro forma capitalization: 109.7M common shares, 147.3M fully diluted.
These cautions are disclosed by the company.
Who runs the company
- Steve Halabura, Chief Executive Officer and Director
- Quinton Hardage, President and Chief Operating Officer
- Akash Patel, Chief Financial Officer
Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.