From: Mike Sent: January 27, 2009 6:21 PM To: cqv Subject: 1070 question
Hi Mr. Millan My question is hypothetical in nature, but curious, to myself, as a shareholder with CIVC. PDIP/ENEGOIL claim that success at Garden Hill would make them self-financing, and I am aware that CIVC will be entitled to some royalty payments.
My question deals with the possibilty of PDIP wanting to take another shot at the Aguathuna at a different location than that drilled by SPE. Do the percentages revert back to (40CIVC/60PDIP)? Mr. Edwards replied to me that CIVC can move ahead at penalty, and I am wondering if SPE has the same rights if the location within 1070 changes from Shoal Point. Thanks in Advance Mike
Mike:
EL 1070, for the purposes of the SPE farmin, is divided into 2 blocks. The earning block, approximately, is Port au Port Bay and the non-earning block is the rest, including the Lourdes prospect. Assuming SPE has earned, then further operations are governed by an operating agreement under which any interest holder can propose a well. If a well is proposed, then the non-proposing parties have to elect whether or not to participate financially as to their working interest. A decision not to participate leads to defined penalties depending on the classification of the well and there are generally buy-back provisions after the well has been drilled.
The above is a summary of a complex legal document. While I believe that what I have written is generally correct, I am not a lawyer and I have not reviewed the agreement recently.
Below is email response from my previous question to Steve... Now we all have an understanding of how much production there is and how exact it is. Now there cannot be any dispute as to how much CIVC is currently producing from Alberta...
The bottom line is that we have a 10% WI (working interest) in 16 oil wells, a 20% WI in 2 gas wells, a 25%WI in 2 gas wells, a 25% WI in 2 gas wells and working interests of between 30% and 35% in 2 further wells that have production tested gas.
The overall production from these wells is modest .
The GLJ report was on Proven and probable Reserves (P+P) net to us which was estimated at 50 Mboe. I believe that the figure 20 Boe that you quoted was probably daily net production to us from all of the wells.
I was reading some historical information regarding the take over of Encore... I was always under the impression there was only 1 producing well of 20 BOE... in a release of last year it was stated that:
Quote:
"At September 1, 2007 an independent engineering firm, Gilbert Lausten Jung ("GLJ") had estimated P+P reserves of 50 Mboe net to the producing assets. An updated, 51-101 compliant reserves evaluation is underway by GLJ and will be complete by late June / early July. "
End Quote:
So are there more than one producing well and the 20 BOE is old information based on 2007 production and there is actually more oil being produced from more than one well ??
Thanks Wolf. Good info. Wish he had stated daily production from each. I guess that will come from the missing NI 51-101 that was comleted last year. They may have more than 50,000 BOE now. They have to file the NI 51-101 annually so I'm awaiting the release of that document sometime in the next few months. I calculated the 20 BOE to 7,300 per year or $182,500 per year net at $25 per BOE. Enought to keep the lights on for now.
One sentence strikes me in Steve Millan's reply: 'Assuming SPE has earned, then further operations are governed by an operating agreement under which any interest holder can propose a well.'
'Assuming SPE has earned' seems to cast doubt on whether SPE has actually earned into the last well and is still attempting to do so. I have said several times that I believe SPE came out of K39Z with a debt. So if we assume SPE has not earned yet, can none of partners propose a well, or could either CIVC or PDIP propose a well, though it might leave SPE out in the cold.