Skip to content
Sign in

Capacitor Metals Corp.

Official AGORACOM Client Hub

Capacitor Metals Corp.

Capacitor Metals is advancing the Upper Fir tantalum-niobium deposit at its Blue River Project in British Columbia, with an updated economic study from SRK targeted for Q1 2027.

Tantalum and niobium in British Columbia: the Upper Fir deposit at the Blue River Project.

Issued on behalf of Capacitor Metals Corp. Disclosure

Sentiment

No picks yet

Sign in to say how you feel about this company.

About

Capacitor Metals Corp. is a British Columbia company focused on the Blue River Tantalum-Niobium Project in British Columbia, Canada, which it owns 100%, with no royalties or back-in rights. The company is not yet listed; its November 2026 presentation sets a CSE listing for Q1 2027. Tantalum is used in microchips, semiconductors and capacitors; niobium in high-strength steel, jet and rocket engine alloys and superconducting magnets.

The property covers more than 1,000 km² with 249 mineral titles, 23 km north of the town of Blue River. It holds three defined deposits, Verity, Fir and Upper Fir, and more than 20 other known exploration targets. More than CAD$34 million has been spent to date. The company's website lists 271 core drill holes for 59,110 m across the Upper Fir, Bone Creek and Lower Fir carbonatites. AMEC's 2013 estimate gives Upper Fir a historical indicated resource of 48.4 million tonnes at 197 ppm Ta₂O₅ and 1,610 ppm Nb₂O₅, and a historical inferred resource of 5.4 million tonnes at 191 ppm Ta₂O₅ and 1,760 ppm Nb₂O₅. Capacitor's releases put the indicated part at 21 million pounds of tantalum and 171 million pounds of niobium, and the inferred part at 2.2 million pounds of tantalum and 21 million pounds of niobium. Capacitor's releases describe these as historical estimates (AMEC, effective June 21, 2013); read them as historical, not current. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

In October 2026 Capacitor announced it had engaged SRK Consulting for an updated NI 43-101 Preliminary Economic Assessment, targeted for Q1 2027; the company says the 2011 PEA should not be relied on as current economics. A metallurgical program at SGS started in July 2026. Capacitor also supplies Upper Fir material to BLOOM, a research project funded by Horizon Europe, and is a member of the U.S. Defense Industrial Base Consortium, where, after Stage 1 approval, it is under consideration for US$16 million in grant funding; no award has been made.

Company facts

Exchange
CSE
Industry
Metals & Minerals

The Big Picture

Capacitor has one project, Blue River in British Columbia, and its Upper Fir deposit is the focus. SRK is updating the deposit's economics, SGS began testing how to recover the metals in July 2026, and Upper Fir material has been used as feedstock in an EU-funded pilot plant in Spain.

Upper Fir deposit, historical estimate (AMEC 2013): indicated 21M lb tantalum and 171M lb niobium; inferred 2.2M lb tantalum and 21M lb niobium (Capacitor releases, July 2026). Not mineral reserves.Updated PEA by SRK Consulting, targeted for Q1 2027 (not guaranteed). The company presentation says the June 2026 scoping study used a tantalum price 300% higher than the earlier PEA. About 2,000 tonnes of bulk sample were extracted before the 2011 PEA.Horizon Europe BLOOM project: Upper Fir material used in an EU pilot plant; CAD$265K grant awarded, 1,060 kg of material shipped to Spain, 14 partners from 6 countries.Site, per the Nov 2026 company presentation: a 4 km gravel road from Highway 5, the CN Rail main line and BC Hydro power lines on the property.
  1. Upper Fir deposit

    The most advanced of three deposits on the Blue River Property, hosted in carbonatite. AMEC estimate (2013), which the company calls historical: 48.4 million tonnes indicated and 5.4 million tonnes inferred. More than CAD$34 million has been spent on the project to date.

    BLOOM testing found the dominant minerals are pyrochlore and ferro-columbite.Jul 24, 2026
  2. New PEA and metallurgy

    SRK reviewed the project data in June, visited the site in early September and is preparing an updated NI 43-101 PEA using current tantalum and niobium prices. SGS in Burnaby began testing Upper Fir material in July 2026: first a concentrate, then separated tantalum and niobium oxides.

    SRK engaged for an updated PEA, targeted for Q1 2027.Oct 21, 2026
  3. Horizon Europe BLOOM

    BLOOM, led by the Universitat Politècnica de Catalunya in Barcelona, is developing sensor technology to improve how critical minerals like tantalum and niobium are processed. Capacitor was awarded a CAD$265K grant to supply Upper Fir material and has shipped about 1,060 kg.

    Third grant payment of CAD$93,000 received from Horizon Europe.Sep 15, 2026
  4. Site and community

    The company presentation says the property is reached from Highway 5 by a 4 km gravel road, with the CN Rail main line and BC Hydro power lines on the property and the North Thompson River on its western edge. Capacitor signed an updated exploration agreement with the Simpcw First Nation in October 2026.

Milestones

  1. Oct 21, 2026SRK engaged for an updated PEA, targeted for Q1 2027

    An updated NI 43-101 PEA of Upper Fir at current tantalum and niobium prices. SRK found the project data sufficient in June and visited the site in early September.

  2. Sep 15, 2026Third BLOOM payment: CAD$93,000

    Paid by Horizon Europe for the next year of the BLOOM program, after Capacitor supplied over one tonne of Upper Fir material.

  3. Jul 24, 2026Upper Fir material in an EU pilot plant

    The BLOOM review was held in Barcelona and at the mobile processing plant in Manresa, Spain. Testing found Upper Fir's dominant minerals are pyrochlore and ferro-columbite.

Deck Highlights

Helicopter in the mountains (Capacitor Metals photo)
CSE listing planned Q1 2027

Capacitor Metals Corp.

Tantalum and niobium at the Upper Fir deposit in British Columbia

Tantalum and niobium.Road, rail and power on site.Updated PEA targeted for Q1 2027.

Tantalum goes into microchips, semiconductors and capacitors; niobium into high-strength steel and superconducting magnets. Capacitor owns 100% of the Blue River Project and its Upper Fir deposit. SRK is updating the economics, and the company plans to list on the CSE in Q1 2027. Timelines are company targets and may change.

21M lb
Ta indicated*
171M lb
Nb indicated*
$34M+
CAD spent to date
249
Mineral titles

Tantalum and niobium from one deposit.

The shift

Demand is rising.

The company says the West has little tantalum of its own.

  • Central Africa is the main source, and its output is falling
  • Former Western producers are mostly shut
  • Little comes from lithium mining or recycling
  • Some large buyers have a "No Africa" policy

These are the points in Capacitor's November 2026 deck, which the company has not had independently verified. The deck says demand from AI, data centres, energy storage, wireless, robotics, EVs and aerospace is growing faster than global GDP.

View of the North Thompson River near the Blue River Project (company photo)
View of the North Thompson River near the Blue River Project (company photo)
10%+
of global tantalum demand: Capacitor's stated aim (forward-looking; no current economic study or production decision)
~3x
heat conduction of theta-phase tantalum nitride vs copper, per a UCLA/Argonne report cited in the deck (research stage)

A tantalum-niobium project in Canada, with road, rail and power at the property (company deck).

The plan

From rock to oxide

Resource. Study. Product.

Upper Fir has been drilled and sampled for years, much of it by earlier owners. The work now is to update the economics and prove the processing.

Resource

Upper Fir deposit

A historical AMEC estimate (2013), based on 271 drill holes; more than CAD$34 million spent on the project to date.

Study

Updated PEA

SRK Consulting is preparing an NI 43-101 PEA at current prices, targeted for Q1 2027.

Product

Oxides for industry

SGS began testing Upper Fir material in July 2026: first a concentrate, then separated tantalum and niobium oxides.

Indicated
48.4 million tonnes at 197 ppm Ta₂O₅ and 1,610 ppm Nb₂O₅ (historical, AMEC 2013).
Inferred
5.4 million tonnes at 191 ppm Ta₂O₅ and 1,760 ppm Nb₂O₅ (historical, AMEC 2013).
Past recoveries
77.2% for tantalum and 75.1% for niobium in test work after the 2011 PEA (historical results).
Bulk sample
About 2,000 tonnes extracted before the 2011 PEA; about 120 tonnes in storage in Richmond, BC.

Tantalum and niobium from one deposit.

Partners

Tested in Europe,

considered in the U.S.

Upper Fir material has been used in a European research plant, and a U.S. defence consortium is considering a grant request.

Inside the BLOOM mobile pilot plant in Manresa, Spain (company photo)BLOOM project

Horizon Europe · led by UPC, Barcelona

An EU-funded mobile pilot plant in Spain has used Upper Fir material as feedstock.

Grant
CAD$265K awarded.
Shipped
1,060 kg to Spain.
Team
14 partners, 6 countries.

The third payment, CAD$93,000, arrived in September 2026 for the next year of work.

What happened

  • First payment: CAD$87K received in February 2025.
  • Shipments: about 20 kg of drill core, 220 kg of pulverized material and 820 kg of crushed rock.
  • July 2026 review: at UPC in Barcelona and at the pilot plant in Manresa, Spain.
Reviewing drill core (Capacitor Metals photo)U.S. DIBC

U.S. Defense Industrial Base Consortium

A U.S. defence consortium is considering US$16 million in grant funding.

Status
Stage 1 approval received.
Amount
US$16M under consideration.
Member
Capacitor is a member.

Not yet awarded: the funding is still under consideration.

Rationale quoted in the company deck

  • Consideration rationale: the white paper "would directly address supply risks for tantalum and niobium raw materials" (as quoted in Capacitor's Nov 2026 deck; not independently verified).
Why now

Four trends

the company points to

Supply

Supply is narrow and shrinking

Central African output is falling, Western producers are mostly shut, and little tantalum comes from lithium mining or recycling, the deck says.

Demand

More uses, more interest

The deck lists AI, data centres, energy storage, robotics and aerospace among tantalum's uses. The 2026 T.I.C. General Assembly had its largest attendance ever, Capacitor said in September.

Prices

Higher prices than the old study

Capacitor says SRK's June 2026 scoping study used a tantalum price about 300% higher and a niobium price about 30% higher than the earlier PEA, and the PEA update will use current prices. Price assumptions are the company's; prices can fall.

Research

A new tantalum material

Capacitor's deck cites an April 2026 UCLA and Argonne National Laboratory report of theta-phase tantalum nitride, said to conduct heat nearly three times better than copper. It is research, not yet a product.

The resource

A historical estimate,

drilled over many years

Contained metal in AMEC's 2013 estimate, as given in Capacitor's July 2026 releases. Indicated and inferred are shown separately and are not added together.

21M lb

Tantalum in the historical indicated resource. Inferred: a further 2.2M lb, with lower confidence.

171M lb

Niobium in the historical indicated resource. Inferred: a further 21M lb, with lower confidence.

Upper Fir historical resource

Million tonnes · AMEC 2013 estimate

Indicated197 ppm Ta₂O₅ · 1,610 ppm Nb₂O₅
48.4M t
Inferred191 ppm Ta₂O₅ · 1,760 ppm Nb₂O₅
5.4M t

Capacitor's releases describe these as historical estimates (AMEC, effective June 21, 2013); read them as historical, not current. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The updated PEA will look at the economics at current prices.

Catalysts

What to watch

Upcoming milestones

Recent announcements and the company's own targets. Target dates aren't guaranteed, so watch for news releases confirming each one.

  1. Now · Q4 2026
    • Updated PEA: SRK engaged (announced Oct 21) after a June data review and an early-September site visitUnder way
    • Metallurgy at SGS: program started in July 2026, expected to run until fall 2026; no results published yetStarted
    • U.S. DIBC: US$16 million in grant funding under consideration after Stage 1 approvalPending
    • Simpcw First Nation: updated exploration agreement signed in October; archaeological overview assessment pendingSigned
  2. Q1 2027

    • Updated PEA targeted by SRKTarget
    • CSE listing: audited financials and prospectus under wayTarget
  3. Next

    • Final oxide samples from pilot processing of the bulk sample, for industry requestsTarget
    • Industry partner: listed in the deck as a next stepTarget
The difference

Upper Fir

An advanced project

Early-stage work

  • Staking claims
  • First drill holes
  • A first resource estimate
  • Early studies

Where many explorers start

Upper Fir today

  • 271 holes drilled
  • Historical resource (AMEC 2013)
  • Bulk sample taken before 2011
  • PEA update under way

CAD$34M+ spent on the project to date, including by prior owners

Infrastructure in place

Highway access, the CN Rail main line and BC Hydro power lines on the property, and the North Thompson River on its western edge (company deck).

Tantalum people

Director Dr. Axel Hoppe ran technical services at H.C. Starck and was president of the tantalum-niobium industry association (T.I.C.) in 2002 and 2007.

A long local relationship

Engagement with the Simpcw First Nation dates back to 2006; an updated exploration agreement was signed in October 2026.

We are excited to have SRK working on the updated economics for our Upper Fir Deposit, considering the heightened global dynamics for tantalum, with continued increased global demand against issues on the side of supply.
Chris Grove · President and CEO, Capacitor Metals · Oct 21, 2026
Company contact

Talk to the company

Capacitor is a private company preparing to list on the CSE. Read its news and corporate presentation on the company website before making any decision.

President and CEO
Chris Grove
Phone
236 484 0284
Listing
Private CSE listing planned Q1 2027

This profile was prepared from Capacitor Metals Corp.'s corporate presentation dated November 2026, its website and its news releases to October 21, 2026. It is for information only and is not an offer to sell or a solicitation to buy securities. Capacitor is a private company; its planned CSE listing is not assured. It contains forward-looking statements, including target dates, study timing, grant funding under consideration and production goals, that involve risks and uncertainties; actual results may differ materially. * Resource figures are from AMEC's 2013 estimate, which Capacitor's releases describe as historical; indicated and inferred resources are reported separately and inferred resources carry more uncertainty. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Grades are as labelled in the AMEC resource table on the company website (Ta₂O₅, Nb₂O₅); contained pounds are as given in the company's July 2026 releases. Market, supply and research statements are taken from the company's presentation and have not been independently verified. The 2011 PEA is referenced only as past work and should not be relied on as current project economics. Recovery rates are historical test results, not production results. Do your own research before investing.

Management

  • Chris Grove

    President & CEO

    Chris’ history with the Blue River Project extends back more than 20 years. His encyclopedic knowledge of the tantalum and niobium industries globally is renowned. Along with Dave Hodge, Chris was responsible for raising the more than $34M invested in advancing the project to this point.

  • Dave Hodge

    Founder & Director

    Founder and former CEO of Commerce Resources Corp. Dave led the team that IPO’d Commerce Resources, the original Blue River Project owners in 2001. Dave and Commerce raised more then $34M towards the advancement of the Blue River Project.

  • Dr. Axel Hoppe

    PhD. Chem & Director

    Axel is an internationally acknowledged leader in the global tantalum market. Formerly Head of Technical Services and Engineering Group for H.C. Starck, the world’s largest consumer of tantalum. President of the Tantalum and Niobium International Study Center for the years 2002 and 2007.

  • Justin Schroenn

    Vice President, Director

    Another former Commerce Resources man, Justin goes back 8 years with the Blue River project. Justin has raised significant capital for both Blue River Project and its former sister project, the Ashram Rare Earth Element project in Quebec and is well known to both Capacitor and Commerce shareholders.

  • Max Lentz

    MBA & Director

    Max has over 40 years background in business ownership and management. He was an Electoral Area Director for the Thompson Nicola Regional District (TNRD) representing Area “B” (Avola – Blue River). Max was also a Director for the Thompson Regional Hospital District, and the Vice Chair for the TNRD Regional Growth Strategy Committee. His major accomplishments include bringing TELUS Cell Phone towers and High-Speed Internet to Blue River and other communities.

Disclosure

Issued on Behalf of Capacitor Metals Corp. Read the full disclaimer

(null:CSE) | Company Profile | Capacitor Metals Corp. | AGORACOM