Skip to content
Sign in

Cartier Resources Inc.

$ECR · TSX-V

Unclaimed AGORACOM Hub

Cartier Resources Inc.

  • CanadaTSXV:ECR
  • United StatesOTCQB:ECRFF

Cartier Resources Inc. is a gold exploration company founded in 2006 and headquartered in Val-d'Or, Quebec, advancing the 100%-owned Cadillac Project, a 14,000-hectare land package along a 15-km segment of the Larder Lake-Cadillac Fault Zone.

Company facts

Exchange
TSX-V
Symbol
ECR
Secondary symbol
ECRFF
Industry
Metals & Minerals

Company overview

TSX-V: ECROTCQB: ECRFF

Cartier Resources Inc.

Gold exploration company advancing Cadillac Project in Quebec.

100%-owned Cadillac Project.Updated PEA: NPV C$1.0B, IRR 26.6%.Agnico Eagle holds 27% stake.

Cartier Resources Inc. is a gold exploration company founded in 2006 and headquartered in Val-d'Or, Quebec. It is advancing the 100%-owned Cadillac Project, a 14,000-hectare land package along a 15-km segment of the Larder Lake-Cadillac Fault Zone. The company has completed an updated preliminary economic assessment and is drilling; Agnico Eagle Mines holds a 27% equity stake.

C$5.5M
Cash
C$43.4M
Total assets
446.2M
Shares out
C$1.3M
Net loss (6 mo)

Gold exploration in the heart of Val-d'Or, Quebec.

The company

Gold exploration in Val-d'Or, Quebec

Cartier Resources

  • Founded in 2006, headquartered in Val-d'Or, Quebec.
  • 100% owner of the 14,000-ha Cadillac Project.
  • Agnico Eagle Mines holds a 27% equity stake.

Cartier is advancing the Cadillac Project along the Larder Lake-Cadillac Fault Zone. The company has completed an updated PEA and is drilling; it reports no revenue.

The projects

The Cadillac Project is Cartier's main asset.

Cadillac Project and JV assets

Val-d'Or, Quebec

Cadillac Project

100% owned, 14,000 ha along the Larder Lake-Cadillac Fault Zone. Updated PEA: 16.2-year mine life, 100 koz/yr average, initial capex C$275.8M at US$3,600/oz.

Main Sector

Main Sector (Chimo, East Chimo, West Nordeau)

Core deposit cluster hosting 736,600 oz M&I and 2,036,800 oz inferred. Recent drill: 2.1 g/t Au over 19.1 m.

Option

Wilson, Fenton and Benoist option

Optioned to Exploits Discovery Corp. for C$1.75M cash, 9.25M shares, C$12.25M exploration. Cartier would retain a 2% NSR royalty.

The numbers

Financial snapshot as of June 30, 2026

Financial position

C$5.5M

Cash and cash equivalents at June 30, 2026, C$5,501,413.

C$43.4M

Total assets at June 30, 2026, C$43,375,908.

C$1.3M

Net loss for the six months ended June 30, 2026, C$1,266,329.

446.2M

Common shares outstanding as of November 6, 2026, 446,160,140.

All figures in Canadian dollars.

The last 12 months

Recent developments

  1. Nov 2026
    • Strategic shift discussed. CEO discussed advancing a smaller portion of Cadillac toward production with toll milling; decision expected early 2027.
  2. Oct 2026

    • PEA technical report filed. NI 43-101 technical report for updated PEA filed on SEDAR+.
  3. Sep 2026

    • Updated PEA results. After-tax NPV5% C$1,001M, IRR 26.6%, 16.2-year mine life, initial capex C$275.8M at US$3,600/oz gold.
  4. Jun 2026

    • Drill result at Main Sector. Hole CA26-595 returned 2.1 g/t Au over 19.1 m, including 19.6 g/t Au over 1.0 m.
  5. May 2026

    • Metallurgical testwork. 96.3% gold extraction after less than 48 hours of cyanide leaching on Main Sector samples.
  6. Dec 2025

    • Resource estimate updated. Updated resource at Cadillac: 767,800 oz Au M&I and 2,416,900 oz Au inferred.
What's next

Planned milestones

  1. Early 2027

    • Strategy decision. The company expects to decide on its next strategy for Cadillac, evaluating a smaller portion toward production, possibly with toll milling, additional exploration and capital preservation.Planned
  2. Ongoing

    • Drill program redesign. The company will redesign its initial 100,000-metre drilling program in light of results from the Contact and Hope sectors.Planned
  3. Ongoing

    • Environmental baseline studies. Environmental baseline studies are continuing, with updates to be provided in the coming months.Planned
Things to know

Things to know

  • Going concern uncertainty noted in Q2 2026 MD&A.
  • PEA is preliminary; resources not reserves and lack economic viability.
  • No revenues; company in exploration and development stage.
Leadership

Who runs the company

  • Philippe Cloutier, President and Chief Executive Officer
  • Nancy Lacoursière, Chief Financial Officer
  • Daniel Massé, Chairman of the Board

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.