Skip to content
Sign in

Post

Copper Fox Metals Inc.

You’re reading Riskkee’s reply in this thread.Jump to it

Prez3.9 rating from 149 members13.9K ptsRate

2011 drilling...

New or updated doc on Sedar. Some tidbits on the 2011 drilling. As can be expected there are a few duds. I'm looking forward to DH 422, 423 & 424. Fingers crossed.

pg 26 & 27

http://sedar.com/GetFile.do?lang=EN&docClass=1&issuerNo=00020511&fileName=/csfsprod/data125/filings/01809549/00000002/C%3A%5CFilings%5CPMR%5CCopperFox%5C2011VoluntaryAIF%5CAmended2011AIF_CUU.pdf

The 2011 diamond drilling program concentrated primarily in the Paramount zone. Twenty two holes totalling 9,649.3 m were drilled and all but seven were in the Paramount zone. A list to the 2011 drill holes completed and the purpose of each hole is set out in the table below [table not copied see NR*]. Three holes drilled into the Paramount zone failed to reach their target depths due to challenging ground conditions and had to be abandoned and re-started in the same location. [I think we know about these 410A...]

One hole was drilled beyond the south end of the deposit but failed to provide adequate geological support to explain the target chargeability anomaly. One hole was drilled to the west of the Liard deposit to test a previouslyreported mineralized interval and a coincident chargeability anomaly identified by the Titan-24 survey completed in2011. One hole was drilled approximately 1.5 kms north of the Paramount zone.

The analytical results for drill holes CF407-2011 to CF412B-2011 have been reported. Analytical results for the balance of the holes completed at Schaft Creek in 2011 will be reported on receipt thereof.

*DH NR: http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=490697&_Type=News-Releases&_Title=Drilling-Intersects-0.91-Copper-Equivalent-over-387M-at-Schaft-Creek

Join the conversation about Copper Fox Metals Inc.

Reply

Replies

  1. First teck will not pay a 500 percent premium on anything. The share price has a log way to go before teck will pay 7 dollars. I still think 2.50 is our number. No math just being realistic. People were screaming 10 dollar takeout when I was invested in canplasts and final number was somewhere around 4.70.
    1. This is expected in a porphry deposit covering miles. The grades are
      continuing to go up as expected and the total reserves are increasing
      along with the resource. Using shareknow or the JB method demonstrates
      the huge share price at buyout is not pie in the sky. The question is:
      Does Teck take it all? Some people are projecting a $3 share. To
      achieve that the prices for the 3 year trailing would have to be cut
      in half.

      The JB method gives:
      8.5B Copper $2.5 = $21.25B
      500m Moly $16 = $8B
      8m Gold $1000 = $8B
      38m Silver $15 = $570M (1.5g/t?)
      About $38 billion/400million shares = $95 a share @8% = $7.60
      Add 4 times drilling @ 65cents

      Total $8.25

      Old projection was $7.87
      38 cent gain on the drilling.

      Using Shareknow: and adding silver (about $1) minus adjustments gives
      us $59 a share.
      Take 24% and you get 14.60 a share
      add 65 cents for drilling cost
      add 38 cents for the new results (size and grade improvements)
      Silver $1

      Total $16.63

      This is just what we have currently. Because of the value Teck may have to take just the proven from us and buy the rest later. Take 25% off to allow for high grading and Mill revenue limitations and the numbers are still higher than what people Expect Teck to pay for us. How cheap do you think CUU will let this go for? The gross amount is $12.4 billion and a quarter of that is $3 billion. (This does not include the Rhenium. 1/2 to 1 billion worth.)

      Go run your own numbers on shareknow and see for yourself.

      1. How does quandra measure up using these valuations? I know insider ownership is key but why overpay for CUU because insiders control when you can make a low ball like with quandra
      2. Your numbers are half way there Webgogs. You just need to factor in what the mine is worth today. The bottom of SC won't be seen for more than 25 years. Calculate the yearly income in metals, subtract the mining costs and discount each year for 25 years.

        Say, using if we use your metal prices, RE metal recoveries and metal selling costs etc, we are left with a Net Revenue is $550M a year for each full year you mine (360 days a year).

        Discounting the sum $550M over 25 years at 8% leaves you $80M for that final year. In other terms. A person using NPV will say that that $550M income in year 25 is only worth $80M to me know if i were to buy it.

        Starter Pit and Capex can make a signficant difference

        Using $550M Net revenue for each year.... And $3B even spent over 4 yrs prior to mining....

        Yr Net Revenue (NPV)

        -4 -$300,000,000

        -3 -$600,000,000

        -2 -$900,000,000

        -1 -$1,200,000,000 (Total of $3B)

        1 $509,411,462 (I discount this year when it probably should be Zero => add $50m)

        2 $471,677,279

        3 $436,738,222

        4 $404,387,242

        5 $374,432,632

        6 $346,696,881

        7 $321,015,631

        8 $297,236,695

        9 $275,219,162

        10 $254,832,558

        11 $235,956,072

        12 $218,477,844

        13 $202,294,300

        14 $187,309,537

        15 $173,434,757

        16 $160,587,738

        17 $148,692,350

        18 $137,678,102

        19 $127,479,724

        20 $118,036,781

        21 $109,293,316

        22 $101,197,515

        25 $80,333,850

        24 $35,571,829 (partial year)

        Total NPV $2,727,991,477

        http://en.wikipedia.org/wiki/Net_present_value

        1. Thanks Chappy. These are the numbers we need to make sensible estimates of the value of the company. Hopefully they can keep capex to $3B, but it will be a struggle. The big capex savings they have booked is NTL, but they still need a power line and local emergency generation. The pit design is actually looking more expensive if you move up slope towards the higher grade. We'll know soon enough, but the numbers you post here are why I have focused on specific capex savings in my valuation. What worries me is how most of these projects in BC have seen on the order of 25% inflation from 2008 on comparable line items.

          1. The last word from Elmer was that he had room to shave some of the cost off. He is using the titans of the industry and they forcast the price estimates to include inflation. They did not give the current prices of the time.

            We have about 18 years at .27 but the new drill results are giving us 4 years of high grade. This makes a big difference. Below is the resource estimate and it obviously doesn't have the gravy in it.

            The impact of the high-grade samples on the resource estimate for the Schaft Creek deposit was completed using uncapped and capped grade models. The capping grade thresholds and the estimated percentage of metal removed from the resource estimate are shown below in Table-2.

            Table-2: Cap Grade Thresholds and Estimated Metal Removed

            Main Zone Cap Grade Number Capped Metal Removed Mean No Cap Mean Capped
            Copper 1.30% 23 0.20% 0.26065 0.26025
            Gold 2.0 g/t 13 0.80% 0.18185 0.18045
            Moly > 0.01% 0.30% 9 0.70% 0.02259 0.02244
            Moly < 0.01% 0.05% 41 4.70% 0.00575 0.00548
            Breccia Zone Cap Grade Number Capped Metal Removed Mean No Cap Mean Capped
            Copper 2.00% 10 0.40% 0.27754 0.27653
            Gold 2.0 g/t 13 3.40% 0.16103 0.15552
            Moly > 0.01% 0.31% 4 0.50% 0.02526 0.02513
            Moly < 0.01% 0.05% 13 5.90% 0.00696 0.00655
      3. Great numbers But when was the last time a company was bought out using either of these two methods? This is a serious question.
        1. When the resource is of a definite size the JB method is more accurate. Copper Canyon is an example of this but you have to factor in the negatives from the IRR to get the true picture. There are a few others that could be compared but they have transportation logistics to deal with. WRN? I think would be one. Several Kamloops area one come to mind and a couple near Highland Valley are also in the running.

          The issue becomes clouded when the resource is open and has some proof of it. I think Elmer will be forced to divide it up. We have focused of the main areas for this reason. This way we can apply the JB method to just the RE data as given. That gives us a basis for negotiations. The remainder of the property will have to be abandonded by Teck or a new contract for exploration must be struck. There's no way around it.

          If we look at it from the yearly returns then they have to give us 2 times the yearly because they could do 300kt/d. The fact that they want to do 150 is not our concern. Suppose Teck decided to do only 90kt/d? Then what? We give the project away because it would take 6 years to pay it back?

          The reality is, and this may be on purpose, we have full proof of 1 SC and partial proof of another 2. That is a juicy dilema to me.

      4. I have great respect for your knowledge and contributions to this board. However these valuation methods are the types newsletter writers use to highlight value, and seldom do these actual numbers materialize. CUU is a great stock that will deliver. But not to the extent some think. How about looking at historic information based on actual buyouts. Percent of NPV, or price per pound of copper?
        1. I have done that. Not only did I use price in my selection I also looked for geology that was a close as I could get it. Then I detailed their IRR statement for good measure. I was not able to blur all the outlier details but I did apply smoothing.

          Our problem is less one of payback and more one of size. They need to buy 1 SC off us and give us the green light to prove up another. I would take a lesser amount for a fat spinco. I got the impression from Elmer that he wants to be free of this alltogether and wants a clean buy out. I doubt he will sell 2 SC at the price of 1.

          Just have a look at what's going on around Teck's Highland Valley for some real perspective. Happy is gaining ground on their deposit rapidly. Once it's defined Teck will give them a JB return for it. They will get 6 years of some pretty good grades. The rest they can pick away at as the please. I expect Happy will discover a larger resource at depth but that may come very late in their game. Some of the other guys around there like Newmont are also making big discoveries. While these are finite deposits the ground is open. I don't think they have found the limits of the Quesnel Trough either.

          So I point out, Teck will not get the whole district for $2.50. That's just not going to happen. That would be like saying TUO and RG need to throw in the towel and fire sale the properties to Teck because the sunk costs now exceed the land value.

            1. Replying to @Todor777

              http://www.stockhouse.com/Community-News/2011/Dec/8/Stockhouse-Movers---Shakers--Why-size-matters-to-m

              Why size matters to mine financier IBK

              Toronto investment banker IBK Capital prefers to back companies with large land packages and experienced management teams.

              In an interview with Stockhouse, White said his company tends to get involved with companies who can assemble big land packages in areas where past production or exploration suggest that the potential exists for value creation in the form of new discoveries.

              “We love to fund those types of situations,’’ he said.

    2. Todor I believe canplates took a low ball offer for sure!!! What did it go for 350 mil? Can't remember off the top of my head. Also the lost holes probably are the reason drills were added late with this new info. Cheers
      1. Yup about 350 mil. There were discussions on SH at the time management would not endorse anything less than 1 bill. There was also huge exploration upside on that one. However there was a spinco involved funded with I think 10 mil
  2. Thanks Chappy. I don't want to dwell on this, but this statement is key to tempering our own optimistic extrapolation of Titan results:

    One hole was drilled beyond the south end of the deposit but failed to provide adequate geological support to explain the target chargeability anomaly.

    I agree, duds will occur and are to be expected. There are rock units described in the area that can meet the chargeability criteria but turn out to be barren.

    1. So much for that 1 to 1 correlation between drilling and titan. Those 7 dollar targets just became a little more of a stretch.
      1. Hold on now Todor... that failed drill was well south of the deposit and agueably in very different geology than the main zones. I imagine that Elmer's confidence in his models decreases as you move outwards from the main zone and the zillions of drills in those areas.

        Even if the drill is a big fat dud, it serves geotechnical purposes and will give Elmer clues about where to go next in relation to that. Is is a big dike with all the mineralization to the west side? Take two big steps west.

        Looking at this again.. I am leaning towards the southern dudd being DH 419. Elmer could have tested that chargeability 'hole' (in darkest blue) to see what was there. I am hoping that it isn't 419 which looks like it is in good chargeability.

        1. It is a dud core, beyond the limit of the deposit, but by their description, showing the chargability characteristics that had previously yielded mineralization. de facto, it is beyond the limit of the deposit because it is a dud. It would have been in the deposit if it was mineralized, LOL. This is why every blob has to be drilled. Common sense, really.

  3. Sorry don't get me wrong. I bought more last week. This is a great stock. And I am long. Don't consider me a bear because I think the final number may not be as high as others. I also don't pretend to know more than many on this board. I am simply challenging what I believe to be a far out valuation. Based on Webs last response I am starting to see it a little more. Canplasts and Thompson creek were two buyouts I was rather diss appointed in.
    1. What I see on Slide 8 of the Chinese presentation is the Interpreted Cross Section 6360650mN - July 2011


      and not the new Interpreted Cross Section 6360650mN November 2011

  4. The analytical results for drill holes CF407-2011 to CF412B-2011 have been reported. Analytical results for the balance of the holes completed at Schaft Creek in 2011 will be reported on receipt thereof.

    This part sounds like the remaining 14 drill holes will be reported at the same time.